Dealing with uncertainty in disassembly line design

被引:59
作者
Bentaha, M. Lounes [1 ]
Battaia, Olga [1 ]
Dolgui, Alexandre [1 ]
Hu, S. Jack [2 ]
机构
[1] Ecole Natl Super Mines, CNRS LIMOS UMR6158, F-42023 St Etienne, France
[2] Univ Michigan, Dept Mech Engn, Ann Arbor, MI 48109 USA
关键词
Disassembly; Uncertainty; Manufacturing system; SEQUENCING PROBLEM; OPTIMIZATION; ALGORITHM; MODEL;
D O I
10.1016/j.cirp.2014.03.004
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A disassembly process is usually characterized by a high level of uncertainty due to the quality of End-of-Life products. This paper presents an efficient approach for designing disassembly lines with the objective to maximize the line profit. Task times are assumed to be random variables with known probability distributions. An AND/OR graph is used to model the precedence relationships among tasks and subassemblies and the disassembly alternatives. A Monte Carlo sampling based exact solution method is developed to deal with uncertainties. Results of experiments on problem instances are presented. (C) 2014 CIRP.
引用
收藏
页码:21 / 24
页数:4
相关论文
共 23 条
[1]   A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem [J].
Agrawal, S. ;
Tiwari, M. K. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (06) :1405-1429
[2]   Task-failure-driven rebalancing of disassembly lines [J].
Altekin, F. Tevhide ;
Akkan, Can .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (18) :4955-4976
[3]   Multi-objective optimization of stochastic disassembly line balancing with station paralleling [J].
Aydemir-Karadag, Ayyuce ;
Turkbey, Orhan .
COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 65 (03) :413-425
[4]  
Bentaha ML, 2013, IFIP ADV INF COMM TE, V397, P397
[5]  
Bentaha ML, 2013, IFIP ADV INF COMM TE, V414, P103
[6]  
DeGroot M. H., 2012, PROBABILITY STAT PEA
[7]   Efficiency and feasibility of product disassembly: A case-based study [J].
Duflou, J. R. ;
Seliger, G. ;
Kara, S. ;
Umeda, Y. ;
Ometto, A. ;
Willems, B. .
CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2008, 57 (02) :583-600
[8]   Disassembly line in product recovery [J].
Güngör, A ;
Gupta, SM .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (11) :2569-2589
[9]   A solution approach to the disassembly line balancing problem in the presence of task failures [J].
Güngör, A ;
Gupta, SM .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (07) :1427-1467
[10]   Selective disassembly sequencing: A methodology for the disassembly of end-of-life products [J].
Kara, S. ;
Pornprasitpol, P. ;
Kaebernick, H. .
CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2006, 55 (01) :37-40