A dynamic spare parts ordering and pricing policy based on stochastic programming with multi-choice parameters

被引:4
作者
Li, Ling [1 ,2 ]
Liu, Min [1 ]
Shen, Weiming [1 ]
Cheng, Guoqing [2 ]
机构
[1] Tongji Univ, Sch Elect & Informat Engn, Lab Intelligent Maintenance Syst & Serv, Shanghai, Peoples R China
[2] Jingdezhen Ceram Inst, Sch Informat Engn, Jingdezhen, Peoples R China
基金
中国国家自然科学基金;
关键词
Dynamic ordering and pricing policy; spare parts; stochastic programming; multi-choice programming; SUPPLY CHAIN; INVENTORY MANAGEMENT; DEMAND; MULTIECHELON; UNCERTAINTY; NETWORKS; SUBJECT; SYSTEM; TIME;
D O I
10.1080/13873954.2016.1242140
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper studies the uncertain and random factors in real-life spare parts supply networks which are abstract and complex dynamical systems, then quantifies these factors in a mathematical model. To seek a dynamic spare parts ordering and pricing policy from a distributor's viewpoint, stochastic programming with multi-choice parameters is applied to formulate this objective optimization problem. In our model, the optimal objective is to maximize the total expected profit of the members of the spare parts supply network, and the decision variables are distributor's selling price and ordering quantity in different periods. By using the methods of expectation operator of the fuzzy variable, Lagrange interpolating polynomial and global criteria, the model is solved, and the optimal ordering and pricing policy is obtained. The results of the numerical example and contrast experiments validate the feasibility and efficiency of the proposed model. Some significant conclusions drawn from the results of parameter sensitivity analysis can be referred by management practitioners. This general model can be applied in other fields of supply chain management, where random and uncertain factors need to be considered.
引用
收藏
页码:196 / 221
页数:26
相关论文
共 34 条
[1]   2-Stage stochastic programming approach for hub location problem under uncertainty: A case study of air network of Iran [J].
Adibi, Ali ;
Razmi, Jafar .
JOURNAL OF AIR TRANSPORT MANAGEMENT, 2015, 47 :172-178
[2]  
[Anonymous], 2010, IJRRAS
[3]   Spare parts classification and demand forecasting for stock control: Investigating the gap between research and practice [J].
Bacchetti, Andrea ;
Saccani, Nicola .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2012, 40 (06) :722-737
[4]   Two-stage stochastic programming problems involving multi-choice parameters [J].
Barik, S. K. ;
Biswal, M. P. ;
Chakravarty, D. .
APPLIED MATHEMATICS AND COMPUTATION, 2014, 240 :109-114
[5]   Multi-choice multi-objective linear programming problem [J].
Biswal, M. P. ;
Acharya, Srikumar .
JOURNAL OF INTERDISCIPLINARY MATHEMATICS, 2009, 12 (05) :606-636
[6]   Solving multi-choice linear programming problems by interpolating polynomials [J].
Biswal, M. P. ;
Acharya, S. .
MATHEMATICAL AND COMPUTER MODELLING, 2011, 54 (5-6) :1405-1412
[7]   Revised multi-choice goal programming [J].
Chang, Ching-Ter .
APPLIED MATHEMATICAL MODELLING, 2008, 32 (12) :2587-2595
[8]   Multi-choice goal programming [J].
Chang, Ching-Ter .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2007, 35 (04) :389-396
[9]   Optimal spare ordering policy under a rebate warranty [J].
Chien, Yu-Hung ;
Chen, Jih-An .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 186 (02) :708-719
[10]   Diversified firms on dynamical supply chain cope with financial crisis better [J].
Chong, You Quan ;
Wang, Bin ;
Tan, Gladys Li Yue ;
Cheong, Siew Ann .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2014, 150 :239-245