Stochastic Interchange Scheduling in the Real-Time Electricity Market

被引:10
|
作者
Ji, Yuting [1 ]
Zheng, Tongxin [2 ]
Tong, Lang [1 ]
机构
[1] Cornell Univ, Sch Elect & Comp Engn, Ithaca, NY 14853 USA
[2] ISO New England Inc, Holyoke, MA 01040 USA
基金
美国国家科学基金会;
关键词
Inter-regional interchange scheduling; multi-area economic dispatch; seams issue; social welfare maximization; stochastic optimization; POWER; DISPATCH;
D O I
10.1109/TPWRS.2016.2600635
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The problem of inter-regional interchange scheduling in the presence of stochastic generation and load is considered. An interchange scheduling technique based on a two-stage stochastic minimization of expected operating cost is proposed. Because directly solving the stochastic optimization is intractable, an equivalent problem that maximizes the expected social welfare is formulated. The proposed technique leverages the operator's capability of forecasting locational marginal prices and obtains the optimal interchange schedule without iterations among operators. Several extensions of the proposed technique are also discussed.
引用
收藏
页码:2017 / 2027
页数:11
相关论文
共 50 条
  • [1] The impacts of social learning on a real-time pricing scheme in the electricity market
    Cao, GangCheng
    Fang, Debin
    Wang, Pengyu
    APPLIED ENERGY, 2021, 291
  • [2] Scheduling and real-time control of flexible loads and storage in electricity markets under uncertainty
    Karagiannopoulos, Stavros
    Vrettos, Evangelos
    Andersson, Goeran
    Zima, Marija
    2014 11TH INTERNATIONAL CONFERENCE ON THE EUROPEAN ENERGY MARKET (EEM), 2014,
  • [3] Rethinking real-time electricity pricing
    Allcott, Hunt
    RESOURCE AND ENERGY ECONOMICS, 2011, 33 (04) : 820 - 842
  • [4] Incorporate day-ahead robustness and real-time incentives for electricity market design?
    Guo, Yi
    Han, Xuejiao
    Zhou, Xinyang
    Hug, Gabriela
    APPLIED ENERGY, 2023, 332
  • [5] Stochastic economic model predictive control for real-time scheduling of balance responsible parties
    Ramandi, Mostafa Yousefi
    Bigdeli, Nooshin
    Afshar, Karim
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2020, 118
  • [6] A Robust Approach to Schedule Flexible Ramp in Real-Time Electricity Market Considering Demand Response
    Heidarabadi, Houman
    Hosseini, Seyed Hamid
    Ranjbar, Hossein
    2017 25TH IRANIAN CONFERENCE ON ELECTRICAL ENGINEERING (ICEE), 2017, : 1159 - 1164
  • [7] Flexiramp Market Design for Real-Time Operations: Can It Approach the Stochastic Optimization Ideal?
    Wang, Beibei
    Hobbs, Benjamin F.
    2013 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING (PES), 2013,
  • [8] Stochastic short-term maintenance scheduling of GENCOs in an oligopolistic electricity market
    Ghazvini, Mohammad Ali Fotouhi
    Canizes, Bruno
    Vale, Zita
    Morais, Hugo
    APPLIED ENERGY, 2013, 101 : 667 - 677
  • [9] Optimal scheduling and operation of battery/wind generation system in response to real-time market prices
    Nguyen, Minh Y.
    Yoon, Yong Tae
    IEEJ TRANSACTIONS ON ELECTRICAL AND ELECTRONIC ENGINEERING, 2014, 9 (02) : 129 - 135
  • [10] Optimal wind energy bidding strategies in real-time electricity market with multi-energy sources
    Zhang, Zijing
    Chen, Zhi
    IET RENEWABLE POWER GENERATION, 2019, 13 (13) : 2383 - 2390