Management of divergent production network using decentralised multi-level capacitated lot-sizing models

被引:14
|
作者
Zoghlami, Nesrine [1 ]
Taghipour, Atour [2 ]
Merlo, Christophe [3 ]
Abed, Mourad [4 ]
机构
[1] Ecole Cent Lille, UMR CNRS 8219, LAGIS, F-59650 Villeneuve Dascq, France
[2] Univ le Havre, 25 Rue Philippe Lebon, F-76600 Le Havre, France
[3] Ecole Super Technol Ind ESTIA, Technopole Izarbel, F-64210 Bidart, France
[4] UVHC, LAMIH, UMRCNRS8201, Campus Mt Houy, F-59300 Famars, France
关键词
supply divergent network; coordination; manufacturing systems; information sharing operations planning; supply chain; linear programming; optimisation; incentive systems; multi-level capacitated lot-sizing; SUPPLY CHAIN; SYSTEM; COORDINATION;
D O I
10.1504/IJSTL.2016.078686
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Coordination between manufacturing organisations plays an important and an essential role in performance improvement of all members of supply networks. To achieve a coordinated plan, information sharing is considered as an essential tool, which facilitates the coordination of operations planning. In the real world, sharing the strategic information can be considered as a risk for independent organisations. So many autonomous organisations do not prefer to exchange this information to their partners but the main question is how the coordination can be achieved without these information. This paper seeks to demonstrate how an incentive system can be used and can affect the problem of supply network operations planning coordination when the organisations do not prefer to exchange the strategic information. Our work presents a general approach in order to manage a divergent supply network. Our objective is to show that network coordination of plans can be achieved without exchange of strategic information.
引用
收藏
页码:590 / 604
页数:15
相关论文
共 50 条
  • [31] LOT-SIZING IN CAPACITATED PRODUCTION PLANNING AND CONTROL-SYSTEMS
    HELBER, S
    OR SPEKTRUM, 1995, 17 (01) : 5 - 18
  • [32] Research on Parallel Particle Swarm Optimization Algorithm Based on Cultural Evolution for the Multi-level Capacitated Lot-sizing Problem
    Ma Hui-min
    Ye Chun-ming
    Zhang Shuang
    2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11, 2008, : 965 - +
  • [33] Multi-item capacitated lot-sizing with demand uncertainty
    Brandimarte, Paolo
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (15) : 2997 - 3022
  • [34] A Modeling and Hybridized Decomposition Approach for the Multi-level Capacitated Lot-Sizing Problem with Setup Carryover, Backlogging, and Emission Control
    Nusrat T. Chowdhury
    Mohammed F. Baki
    Ahmed Azab
    Operations Research Forum, 5 (3)
  • [35] Multi-source capacitated lot-sizing for economically viable and clean biofuel production
    Kantas, Alperen Burak
    Cobuloglu, Halil I.
    Bueyuektahtakin, I. Esra
    JOURNAL OF CLEANER PRODUCTION, 2015, 94 : 116 - 129
  • [36] The robust multi-plant capacitated lot-sizing problem
    Jalal, Aura
    Alvarez, Aldair
    Alvarez-Cruz, Cesar
    De la Vega, Jonathan
    Moreno, Alfredo
    TOP, 2023, 31 (02) : 302 - 330
  • [37] New mixed integer approach to solve a multi-level capacitated disassembly lot-sizing problem with defective items and backlogging
    Slama, Ilhem
    Ben-Ammar, Oussama
    Dolgui, Alexandre
    Masmoudi, Faouzi
    JOURNAL OF MANUFACTURING SYSTEMS, 2020, 56 : 50 - 57
  • [38] A math-heuristic for the multi-level capacitated lot sizing problem with carryover
    Institute of Information Systems, University of Hamburg, Von-Melle-Park 5, Hamburg 20146, Germany
    不详
    Lect. Notes Comput. Sci., PART 2 (462-471):
  • [39] A fix-and-optimize approach for the multi-level capacitated lot sizing problem
    Helber, Stefan
    Sahling, Florian
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2010, 123 (02) : 247 - 256
  • [40] A New Heuristic Method for Capacitated Multi-level Lot Sizing Problem with Backlogging
    Wu, Tao
    Shi, Leyuan
    2009 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING, 2009, : 483 - 488