Management of divergent production network using decentralised multi-level capacitated lot-sizing models

被引:14
|
作者
Zoghlami, Nesrine [1 ]
Taghipour, Atour [2 ]
Merlo, Christophe [3 ]
Abed, Mourad [4 ]
机构
[1] Ecole Cent Lille, UMR CNRS 8219, LAGIS, F-59650 Villeneuve Dascq, France
[2] Univ le Havre, 25 Rue Philippe Lebon, F-76600 Le Havre, France
[3] Ecole Super Technol Ind ESTIA, Technopole Izarbel, F-64210 Bidart, France
[4] UVHC, LAMIH, UMRCNRS8201, Campus Mt Houy, F-59300 Famars, France
关键词
supply divergent network; coordination; manufacturing systems; information sharing operations planning; supply chain; linear programming; optimisation; incentive systems; multi-level capacitated lot-sizing; SUPPLY CHAIN; SYSTEM; COORDINATION;
D O I
10.1504/IJSTL.2016.078686
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Coordination between manufacturing organisations plays an important and an essential role in performance improvement of all members of supply networks. To achieve a coordinated plan, information sharing is considered as an essential tool, which facilitates the coordination of operations planning. In the real world, sharing the strategic information can be considered as a risk for independent organisations. So many autonomous organisations do not prefer to exchange this information to their partners but the main question is how the coordination can be achieved without these information. This paper seeks to demonstrate how an incentive system can be used and can affect the problem of supply network operations planning coordination when the organisations do not prefer to exchange the strategic information. Our work presents a general approach in order to manage a divergent supply network. Our objective is to show that network coordination of plans can be achieved without exchange of strategic information.
引用
收藏
页码:590 / 604
页数:15
相关论文
共 50 条
  • [1] Integrated lot-sizing and scheduling with overlapping for multi-level capacitated production system
    Ramezanian, Reza
    Saidi-Mehrabad, Mohammad
    Fattahi, Parviz
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2013, 26 (07) : 681 - 695
  • [2] A multi-level capacitated lot-sizing problem with energy consideration
    Masmoudi, Oussama
    Yalaoui, Alice
    Ouazene, Yassine
    Chehade, Hicham
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 1352 - 1359
  • [3] The capacitated multi-level lot-sizing problem with distributed agents
    Gansterer, Margaretha
    Foedermayr, Patrick
    Hartl, Richard F.
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2021, 235
  • [4] A hybrid optimization approach for multi-level capacitated lot-sizing problems
    Almeder, Christian
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 200 (02) : 599 - 606
  • [5] Lead time considerations for the multi-level capacitated lot-sizing problem
    Almeder, Christian
    Klabjan, Diego
    Traxler, Renate
    Almada-Lobo, Bernardo
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 241 (03) : 727 - 738
  • [6] On the relaxation of multi-level dynamic lot-sizing models
    Vörös, J
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 77 (01) : 53 - 61
  • [7] Lot-sizing Problem in a multi-level production system
    Wu, Feng
    Yao, Yiming
    Liu, Min
    ICOSCM 2007 - INTERNATIONAL CONFERENCE ON OPERATIONS AND SUPPLY CHAIN MANAGEMENT IN CHINA, 2007, 1
  • [8] A matheuristic approach for the multi-level capacitated lot-sizing problem with substitution and backorder
    Qin, Hu
    Zhuang, Haocheng
    Yu, Chunlong
    Li, Jiliu
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2024, 62 (13) : 4645 - 4673
  • [9] A GLNPSO for multi-level capacitated lot-sizing and scheduling problem in the poultry industry
    Boonmee, Atiwat
    Sethanan, Kanchana
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 250 (02) : 652 - 665
  • [10] BFO: a hybrid bees algorithm for the multi-level capacitated lot-sizing problem
    Marcos Mansano Furlan
    Maristela Oliveira Santos
    Journal of Intelligent Manufacturing, 2017, 28 : 929 - 944