Identifying Effective Collaborative Behaviors in Building Information Modeling-Enabled Construction Projects

被引:29
作者
Chen, Guangchong [1 ,2 ]
Chen, Jiayu [2 ]
Tang, Yuchun [1 ]
Li, Qiming [1 ]
Luo, Xiaowei [2 ]
机构
[1] Southeast Univ, Dept Construct & Real Estate, Nanjing 210096, Peoples R China
[2] City Univ Hong Kong, Dept Architecture & Civil Engn, Hong Kong, Peoples R China
关键词
Building information modeling (BIM)-enabled construction projects (BECPs); Collaboration; Integrated project delivery (IPD) philosophy; Collaborative behaviors; Grounded theory; BIM;
D O I
10.1061/(ASCE)CO.1943-7862.0002270
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Collaboration tightly relates to the effective management of construction projects. Especially for building information modeling (BIM)-enabled construction projects (BECPs), collaboration is the prerequisite for effective BIM use. However, different from traditional construction projects, the collaboration process in BECPs should transform into an integrated mode to achieve BIM benefits. Specifically, partners should adopt effective collaborative behaviors supporting an integrated collaboration mode. Therefore, this study intends to systematically identify those effective collaborative behaviors in BECPs. The Integrated project delivery (IPD) philosophy was taken as the theoretical lens, and the grounded theory approach was utilized to deduce the collaborative behaviors based on semistructured interviews about 34 BECPs. Five categories of collaborative behaviors aligned with the IPD philosophy for integrated collaboration were identified, including "Adaption to customized BIM use," "Integrated coordination," "Integrated communication," "Shared responsibility to reduce conflicts," and "Flexibility to support the team." Meanwhile, a theoretical model was established that described how these collaborative behaviors combined for effective BIM use. This research helps broaden the understanding of how partners should collaborate in BECPs and provides a model for further empirical examination.
引用
收藏
页数:13
相关论文
共 42 条
[1]   Enhancement of IPD Characteristics as Impelled by Information and Communication Technology [J].
Ahmad, Irtishad ;
Azhar, Nida ;
Chowdhury, Arindam .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2019, 35 (01)
[2]  
Alreshidi E., 2018, REQUIR ENG, V23, P1, DOI [10.1007/s00766-016-0254-6, DOI 10.1007/s00766-016-0254-6]
[3]   Critical Look into the Relationship between Information and Communication Technology and Integrated Project Delivery in Public Sector Construction [J].
Azhar, Nida ;
Kang, Youngcheol ;
Ahmad, Irtishad .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2015, 31 (05)
[4]   A social network perspective of building information modelling in Greek construction projects [J].
Badi S. ;
Diamantidou D. .
Architectural Engineering and Design Management, 2017, 13 (06) :406-422
[5]   Collaboration at work: An integrative multilevel conceptualization [J].
Bedwell, Wendy L. ;
Wildman, Jessica L. ;
DiazGranados, Deborah ;
Salazar, Maritza ;
Kramer, William S. ;
Salas, Eduardo .
HUMAN RESOURCE MANAGEMENT REVIEW, 2012, 22 (02) :128-145
[6]   Collaboration strategy selection in BIM-enabled construction projects: a perspective through typical collaboration profiles [J].
Chen, Guangchong ;
Chen, Jiayu ;
Tang, Yuchun ;
Ning, Yan ;
Li, Qiming .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2022, 29 (07) :2689-2713
[7]   Identifying and assessing critical risk factors for BIM projects: Empirical study [J].
Chien, Kuo-Feng ;
Wu, Zong-Han ;
Huang, Shyh-Chang .
AUTOMATION IN CONSTRUCTION, 2014, 45 :1-15
[8]  
Corbin J., 2008, Techniques and Procedures for Developing Grounded Theory, DOI [10.4135/9781452230153, DOI 10.4135/9781452230153]
[9]   The Dynamics of Collaboration in Multipartner Projects [J].
Dietrich, Perttu ;
Eskerod, Pernille ;
Dalcher, Darren ;
Sandhawalia, Birinder .
PROJECT MANAGEMENT JOURNAL, 2010, 41 (04) :59-78
[10]   Organizational Divisions in BIM-Enabled Commercial Construction [J].
Dossick, Carrie S. ;
Neff, Gina .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2010, 136 (04) :459-467