Lowland gravel-bed river recovery through former mining reaches, the key role of sand

被引:6
作者
Depret, Thomas [1 ]
Virmoux, Clement [1 ]
Gautier, Emmanuele [2 ]
Piegay, Herve [3 ]
Doncheva, Mariya [2 ]
Plaisant, Brian [2 ]
Ghamgui, Sirine [2 ]
Mesmin, Evan [2 ]
Saulnier-Copard, Segolene [1 ]
de Milleville, Lucile [4 ]
Cavero, Julien [1 ]
Hamadouche, Pablo [2 ]
机构
[1] CNRS, Lab Geog Phys, UMR8591, 1 Pl Aristide Briand, F-92195 Meudon, France
[2] Univ Paris 1 Pantheon Sorbonne, Lab Geog Phys, CNRS, UMR8591, 1 Pl Aristide Briand, F-92195 Meudon, France
[3] Univ Lyon, UMR Environm Ville Soc 5600, CNRS, Site ENS Lyon,15 Parvis Rene Descartes, F-69342 Lyon, France
[4] Univ Paris Est Creteil, Lab Geog Phys, UMR8591, CNRS, 1 Pl Aristide Briand, F-92195 Meudon, France
关键词
Channel mining; Geomorphic resilience; Sand; Low-energy river; BEDLOAD TRANSPORT; CHANNEL ADJUSTMENTS; CHER RIVER; MEDITERRANEAN RIVER; ALLUVIAL CHANNELS; DYNAMICS; FRANCE; PIT; EVOLUTION; INCISION;
D O I
10.1016/j.geomorph.2020.107493
中图分类号
P9 [自然地理学];
学科分类号
0705 ; 070501 ;
摘要
Whereas the geomorphic effects of in-channel mining have been widely documented, very few studies have focused on recovery trajectories after mining ended. This paper describes and quantifies the channel adjustment of extended and over-widened mining pits located in a low energy gravel-bed river, and identifies the factors that control their recovery rate. The study was based on aerial photographs and LiDAR analysis, grain-size sampling, bedload computation and geophysical measurements made during ground penetrating radar (GPR) and electrical resistivity tomography (ERT) surveys. We describe the spatio-temporal changes in the morphology of former pits as well as the current surficial longitudinal grain-size pattern in pits and in neighbouring upstream and downstream reaches. Our results show a wide range of geomorphic readjustments. Between 23 and 47 yr after the end of mining, the mining reaches have still not yet fully recovered. The planimetric recovery rate is closely correlated with the ratio of the volume deposited in the pits to their original volume. Finally, the infilled material is only partly composed of bedload and the mainly sandy fine sediments play a primary role in the recovery process. The abundance of sand, controlled by the lithology of the watershed, explains the unexpectedly high recovery rates of some pits despite the low energy of the river. (C) 2020 Elsevier B.V. All rights reserved.
引用
收藏
页数:17
相关论文
共 102 条
  • [1] [Anonymous], 2010, EROSION SEDIMENTATIO, DOI DOI 10.1017/CBO9780511806049
  • [2] [Anonymous], 1994, DESIGN HYDROLOGY SED
  • [3] Morphological evolution of the Maipo River in central Chile: Influence of instream gravelmining
    Arrospide, Felipe
    Mao, Luca
    Escauriaza, Cristian
    [J]. GEOMORPHOLOGY, 2018, 306 : 182 - 197
  • [4] Dynamic characterization of the migration of a mining pit in an alluvial channel
    Barman, Bandita
    Kumar, Bimlesh
    Sarma, Arup Kumar
    [J]. INTERNATIONAL JOURNAL OF SEDIMENT RESEARCH, 2019, 34 (02) : 155 - 165
  • [5] Turbulent flow structures and geomorphic characteristics of a mining affected alluvial channel
    Barman, Bandita
    Kumar, Bimlesh
    Sarma, Arup Kumar
    [J]. EARTH SURFACE PROCESSES AND LANDFORMS, 2018, 43 (09) : 1811 - 1824
  • [6] Multiscale characterization of migrating sand wave in mining induced alluvial channel
    Barman, Bandita
    Sharma, Anurag
    Kumar, Bimlesh
    Sarma, Arup Kumar
    [J]. ECOLOGICAL ENGINEERING, 2017, 102 : 199 - 206
  • [7] Diagnosing problems induced by past gravel mining and other disturbances in Southern European rivers: the Magra River, Italy
    Belletti, B.
    Nardi, L.
    Rinaldi, M.
    [J]. AQUATIC SCIENCES, 2016, 78 (01) : 107 - 119
  • [8] Improvement of streams hydro-geomorphological assessment using LiDAR DEMs
    Biron, Pascale M.
    Chone, Guenole
    Buffin-Belanger, Thomas
    Demers, Sylvio
    Olsen, Taylor
    [J]. EARTH SURFACE PROCESSES AND LANDFORMS, 2013, 38 (15) : 1808 - 1821
  • [9] Bravard JP, 1999, INCISED RIVER CHANNELS: PROCESSES, FORMS, ENGINEERING, AND MANAGEMENT, P303
  • [10] Principles of engineering geomorphology for managing channel erosion and bedload transport, examples from French rivers
    Bravard, JP
    Landon, N
    Peiry, JL
    Piégay, H
    [J]. GEOMORPHOLOGY, 1999, 31 (1-4) : 291 - 311