A conceptual approach to modeling the procurement process of construction using petri-nets

被引:6
作者
Li, H [1 ]
Love, PED
Gunasekaran, A
机构
[1] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Kowloon, Peoples R China
[2] Deakin Univ, Sch Architecture & Bldg, Geelong, Vic 3217, Australia
[3] Univ Massachusetts, Dept Management, N Dartmouth, MA 02747 USA
关键词
Petri-Nets; workflow; process; concurrency; synchronization; optimization;
D O I
10.1023/A:1008928714480
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
One way to improve the efficiency and effectiveness of procurement processes is to improve the timeliness of information flows between and among project participants. This can be achieved by condensing sequential processes into concurrent processes that are synchronized so their effectiveness and efficiency can be improved. Essentially existing processes (workflows) are redesigned so that savings in time and cost can be achieved. In order to identify and design the optimum workflow, it is important to have an effective modeling language to describe and simulate the actual operational process. Recently, Petri-Nets (PN) have been used in the manufacturing industry as a tool to analyze the concurrency of operations. Research results indicate that PNs are a useful tool for formalizing, simulating, and designing systems and processes that communicate with one another and need to be synchronized. This paper presents a simple introductory experiment to demonstrate how PNs can be used to simulate workflow in order to identify the optimum procurement process. Initial results from the experiments are reported in the paper.
引用
收藏
页码:347 / 353
页数:7
相关论文
共 23 条
[1]  
ALJAAR RY, 1990, ADV AUTOMATION ROBOT, V2
[2]   A METHOD FOR HIERARCHICAL MODELING OF THE COMMAND OF FLEXIBLE MANUFACTURING SYSTEMS [J].
AUSFELDER, C ;
CASTELAIN, E ;
GENTINA, JC .
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS, 1994, 24 (04) :564-573
[3]   STOCHASTIC PETRI NET SIMULATION [J].
BALBO, G ;
CHIOLA, G .
1989 WINTER SIMULATION CONFERENCE PROCEEDINGS, 1989, :266-276
[4]  
BANASZAK Z, 1987, PETRI NET NEWSLETTER, V27, P3
[5]   DEADLOCK-AVOIDANCE IN FLEXIBLE MANUFACTURING SYSTEMS WITH CONCURRENTLY COMPETING PROCESS FLOWS [J].
BANASZAK, ZA ;
KROGH, BH .
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1990, 6 (06) :724-734
[6]   MODELING AND JUSTIFYING DISCRETE PRODUCTION PROCESSES BY PETRI NETS [J].
CAPKOVIC, F .
COMPUTER INTEGRATED MANUFACTURING SYSTEMS, 1993, 6 (01) :27-35
[7]  
*CONSTR IND I AUST, 1994, BENCHM ENG CONSTR RE
[8]  
DICESARE F, 1991, MODELING CONTROL PER
[9]  
FELDBRUGGE F, 1990, LECT NOTES COMPUT SC, V424, P151
[10]  
HILLION HP, 1989, LECT NOTES COMPUTER, V424