Reliability optimization of wind farms considering redundancy and opportunistic maintenance strategy

被引:63
|
作者
Atashgar, Karim [1 ]
Abdollahzadeh, Hadi [1 ]
机构
[1] Malek Ashtar Univ Technol, Dept Ind Engn, Tehran 158751774, Iran
关键词
Redundancy; Opportunistic maintenance; Wind farm; Three phase simulation; Multi-objective particle swarm optimization algorithm; GENERALIZED RENEWAL PROCESS; LAYOUT OPTIMIZATION; REPAIRABLE SYSTEMS; JOINT REDUNDANCY; MODELS; OPERATION; TURBINES;
D O I
10.1016/j.enconman.2016.01.027
中图分类号
O414.1 [热力学];
学科分类号
摘要
In this paper, a joint redundancy and imperfect block opportunistic maintenance optimization model is formulated. The objective is to determine the wind farm redundancy level and the maintenance strategy which will simultaneously minimize the wind farm loss of load probability and life cycle cost. A new opportunistic maintenance approach is developed to take advantages of the maintenance opportunities. Different reliability thresholds are introduced for imperfect maintenance of failed turbines and working turbines and preventive dispatching of maintenance teams. In addition, a simulation method is developed to evaluate the performance measures of a wind farm system considering different types of wind turbine, maintenance activation delays and durations, and limited number of maintenance teams. Sensitivity analysis is conducted to discuss the influence of the different assumption and parameters of simulation model over the wind farm performance. Pareto optimal solutions are driven based on a multi-objective particle swarm optimization algorithm. Comparative study with the commonly used maintenance policy demonstrates the advantages of the proposed opportunistic maintenance strategy in significantly reducing maintenance cost and loss of load probability. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:445 / 458
页数:14
相关论文
共 50 条
  • [41] A Coordinated Control Strategy Considering the Coherence of Generators for Wind Farms
    Han, Pingping
    Zhang, Jiaqi
    Ding, Ming
    Zhang, Xiao'an
    Yang, Zhijun
    2016 IEEE 8TH INTERNATIONAL POWER ELECTRONICS AND MOTION CONTROL CONFERENCE (IPEMC-ECCE ASIA), 2016,
  • [42] A Condition-based Maintenance Strategy Considering Opportunistic Maintenance In Multiple Failure Modes
    Yang, Si
    Wang, Yan
    Xu, Yijing
    Wang, Mingqiang
    Sun, Donglei
    Li, Wenbo
    2018 INTERNATIONAL CONFERENCE OF GREEN BUILDINGS AND ENVIRONMENTAL MANAGEMENT (GBEM 2018), 2018, 186
  • [43] An Optimization Framework for Opportunistic Maintenance of Offshore Wind Power System
    Besnard, Francois
    Patriksson, Michael
    Stromberg, Ann-Brith
    Wojciechowski, Adam
    Bertling, Lina
    2009 IEEE BUCHAREST POWERTECH, VOLS 1-5, 2009, : 2970 - +
  • [44] Reliability redundancy allocation problem considering optimal redundancy strategy using parallel genetic algorithm
    Kim, Heungseob
    Kim, Pansoo
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2017, 159 : 153 - 160
  • [45] Optimizing the Maintenance Strategy for Offshore Wind Turbines Blades Using Opportunistic Preventive Maintenance
    Psomas, Panagiotis M.
    Platis, Agapios N.
    Koutras, Vasilis P.
    NEW ADVANCES IN DEPENDABILITY OF NETWORKS AND SYSTEMS, DEPCOS-RELCOMEX 2022, 2022, 484 : 227 - 236
  • [46] Optimal Redundancy and Maintenance Strategy Decisions for Offshore Wind Power Converters
    Shafiee, Mahmood
    Patriksson, Michael
    Stromberg, Ann-Brith
    Tjernberg, Lina Bertling
    INTERNATIONAL JOURNAL OF RELIABILITY QUALITY AND SAFETY ENGINEERING, 2015, 22 (03)
  • [47] Reliability Assessment of Offshore Wind Farms Considering Severe Weather Conditions
    Chao, Huawei
    Hu, Bo
    Li, Yanlin
    Xie, Kaigui
    Wu, Tao
    Yan, Jiahao
    2018 2ND IEEE CONFERENCE ON ENERGY INTERNET AND ENERGY SYSTEM INTEGRATION (EI2), 2018,
  • [48] Reliability assessment of composite generation and transmission system considering wind farms
    Jiang, Wen
    Yan, Zheng
    Yang, Jian-Lin
    Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2010, 38 (22): : 126 - 130
  • [49] Life-time reliability based optimization of bridge maintenance strategy considering LCA and LCC
    Xie, Hui-Bing
    Wu, Wen-Jie
    Wang, Yuan-Feng
    JOURNAL OF CLEANER PRODUCTION, 2018, 176 : 36 - 45
  • [50] Adequacy Study of Wind Farms Considering Reliability and Wake Effect of WTGs
    Han, Xiaoqing
    Guo, Jing
    Wang, Peng
    Jia, Yanbing
    2011 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING, 2011,