RETRACTED: Analysis and Design of the Project Risk Management System Based on the Fuzzy Clustering Algorithm (Retracted Article)

被引:2
作者
Zhong, Ping [1 ]
Yin, Hang [2 ,3 ]
Li, Yuanfu [1 ]
机构
[1] Southwest Jiaotong Univ, Sch Civil Engn, Chengdu 610031, Sichuan, Peoples R China
[2] Sichuan Univ, Business Sch, Chengdu 610031, Sichuan, Peoples R China
[3] Sichuan Tourism Univ, Sch Informat & Engn, Chengdu 610031, Sichuan, Peoples R China
基金
中国国家自然科学基金;
关键词
COST;
D O I
10.1155/2022/9328038
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In order to effectively control the cost risk of power grid construction projects, the author proposes a cost risk management system for power grid construction projects based on the fuzzy clustering algorithm. The system introduces the fuzzy clustering maximum tree algorithm, and by constructing a mathematical model, combined with the empirical analysis, the key risk factors in the cost risk of power grid construction projects are identified. Through the analysis, it can be concluded that the key risks in the cost risk of power grid construction projects are the planning risks of infrastructure projects, the research risks of infrastructure projects, and the cost risks of infrastructure projects. Experimental results show that combined with expert experience and the actual situation of power grid engineering, the classification result at threshold lambda=0.785 becomes more realistic. At this lambda level, 6 risk factors are grouped into 4 categories as follows: class I x1,x2,x4, class II x3, class III x5, and class IV x6. Through research, the identification of key risks can enable project managers to control the cost of power grid construction projects, targeted, so that risks can be minimized and investment returns can be improved.
引用
收藏
页数:8
相关论文
共 22 条
[1]   Construction of energy minimized WSN using GA-SAMP-MWPSO and K-mean clustering algorithm with LDCF deployment strategy [J].
Banerjee, Avishek ;
De, Sudip Kumar ;
Majumder, Koushik ;
Dash, Dinesh ;
Chattopadhyay, Samiran .
JOURNAL OF SUPERCOMPUTING, 2022, 78 (08) :11015-11050
[2]   Study on fault identification of mechanical dynamic nonlinear transmission system [J].
Guo, Erfu ;
Jagota, Vishal ;
Makhatha, Mamookho Elizabeth ;
Kumar, Pawan .
NONLINEAR ENGINEERING - MODELING AND APPLICATION, 2021, 10 (01) :518-525
[3]   Risk assessment without the risk? A controversy about security and risk in Norway [J].
Heyerdahl, Anne .
JOURNAL OF RISK RESEARCH, 2022, 25 (02) :252-267
[4]   An Intuitionistic Kernel-Based Fuzzy C-Means Clustering Algorithm With Local Information for Power Equipment Image Segmentation [J].
Hu, Fankui ;
Chen, Haibing ;
Wang, Xiaofei .
IEEE ACCESS, 2020, 8 :4500-4514
[5]   Ship Target Detection Based on Improved YOLO Network [J].
Huang, Hong ;
Sun, Dechao ;
Wang, Renfang ;
Zhu, Chun ;
Liu, Bangquan .
MATHEMATICAL PROBLEMS IN ENGINEERING, 2020, 2020
[6]   Progress of zinc oxide-based nanocomposites in the textile industry [J].
Huang, Ruihang ;
Zhang, Siyang ;
Zhang, Wen ;
Yang, Xiaoming .
IET COLLABORATIVE INTELLIGENT MANUFACTURING, 2021, 3 (03) :281-289
[7]  
Ibrahim AH, 2021, JORDAN J CIV ENG, V15, P329
[8]   Assessment of Risk Impact on Road Project Using Deep Neural Network [J].
Isah, Muritala Adebayo ;
Kim, Byung-Soo .
KSCE JOURNAL OF CIVIL ENGINEERING, 2022, 26 (03) :1014-1023
[9]   RETRACTED: Conceptual Implementation of Artificial Intelligent based E-Mobility Controller in smart city Environment (Retracted Article) [J].
Jayakumar, Jayaraj ;
Nagaraj, Balakrishnan ;
Chacko, Shanty ;
Ajay, P. .
WIRELESS COMMUNICATIONS & MOBILE COMPUTING, 2021, 2021
[10]   Survivability optimisation of communication network for demand response in source-grid-load system [J].
Liu, Lin ;
Li, Bin ;
Qi, Bing ;
Ye, Xin ;
Sun, Yi ;
Cheng, Ziyun .
IET COMMUNICATIONS, 2020, 14 (17) :2972-2980