Alp Transit: Crossing Faults 44 and 49

被引:6
作者
El Tani, M. [1 ]
Bremen, R. [1 ]
机构
[1] Lombardi SA, Minusio Locarno, Switzerland
关键词
Arch dam; Fissured rock; Surface deformation; Water inflow; Tunnel excavation; Grouting; FRACTURED CRYSTALLINE ROCK; SETTLEMENTS; TUNNELS;
D O I
10.1007/s00603-013-0473-9
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
This paper describes the crossing of faults 44 and 49 when constructing the 57 km Gotthard base tunnel of the Alp Transit project. Fault 44 is a permeable fault that triggered significant surface deformations 1,400 m above the tunnel when it was reached by the advancing excavation. The fault runs parallel to the downstream face of the Nalps arch dam. Significant deformations were measured at the dam crown. Fault 49 is sub-vertical and permeable, and runs parallel at the upstream face of the dam. It was necessary to assess the risk when crossing fault 49, as a limit was put on the acceptable dam deformation for structural safety. The simulation model, forecasts and action decided when crossing over the faults are presented, with a brief description of the tunnel, the dam, and the monitoring system.
引用
收藏
页码:1037 / 1048
页数:12
相关论文
共 19 条
[1]  
[Anonymous], 1988, PUBLICATION SOC SUIS
[2]  
DHATT G, 1984, PRESENTATION METHODE
[3]  
Ehrbar H, 2010, GEOMECHANIK TUNNELBA, V3, P428, DOI DOI 10.1002/GEOT.201000035
[4]   Hydrostatic paradox of saturated media [J].
El Tani, M. .
GEOTECHNIQUE, 2007, 57 (09) :773-777
[5]  
El Tani M, 2006, GOLD ROCKS 2006 41 U
[6]  
Guntli P, 2013, BASISTUNNEL UR UNPUB
[7]  
Guntli P, 2011, GR360B3 KERNB
[8]  
Hansmann J, 2012, HYDROGEOL J, V20, P73, DOI 10.1007/s10040-011-0801-7
[9]  
Hughes T. J. R., 2012, FINITE ELEMENT METHO
[10]  
Lombardi G, 1992, DAM ENG, V3, P49