Eddy current effect of magnets for J-PARC 3-GeV synchrotron

被引:7
作者
Tani, N [1 ]
Adachi, I
Someya, H
Watanabe, Y
Sato, H
Kishiro, J
机构
[1] JAERI, Ibaraki, Japan
[2] KEK, High Energy Accelerator Res Org, Tsukuba, Ibaraki 3050801, Japan
关键词
a rapid-cycling synchrotron; eddy current; eddy current loss; fringing field;
D O I
10.1109/tasc.2004.829686
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The 3-GeV synchrotron proposed in the JAERI/KEK Joint Project (J-PARC) is a rapid-cycling synchrotron (RCS), which accelerates a high-intensity proton beam from 400-MeV to 3-GeV at a repetition rate of 25-Hz. The 3-GeV synchrotron is used to produce pulsed spallation neutrons and moons. It also works as an injector for a 50-GeV synchrotron. Since the magnets for the 3-GeV synchrotron are required to have a large aperture in order to realize the large beam power of I MW, there is a larger fringing field at a pole end than for a usual synchrotron magnet. In addition, the 25 Hz ac field induces eddy currents in magnet components: e.g., in the coil, magnet end plates, etc. The eddy current induced in the end plates is expected to be large. Therefore, it is important to investigate the effect of large leakage field and eddy current on the beam motion around the magnet end part. We have measured the eddy loss and the eddy current field at the edges of the dipole and quadrupole magnets. In this paper, we report the comparison between the results of the measurements and the two-dimensional eddy current model developed for this study.
引用
收藏
页码:421 / 424
页数:4
相关论文
共 3 条
  • [1] Kanai Y., 1999, Proceedings of the 1999 Particle Accelerator Conference (Cat. No.99CH36366), P3348, DOI 10.1109/PAC.1999.792299
  • [2] Tani N., 2002, 8th European Particle Accelerator Conference, P2376
  • [3] YMAZAKI Y, 2000, P EPAC2000 VIENN AUS, P286