Condition monitoring: a new perspective

被引:11
作者
Coolen, FPA [1 ]
Coolen-Schrijner, P [1 ]
机构
[1] Univ Durham, Sci Labs, Dept Math Sci, Durham DH1 3LE, England
关键词
condition monitoring; low stochastic structure; methodology; nonparametric predictive inference; replacement policy;
D O I
10.2307/254089
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We present a novel approach to support preventive replacement decisions based on condition monitoring. It is assumed that the condition of a technical unit is measured continuously, with the measurement indicating in which of k greater than or equal to 2 states the unit is. A new unit is in state S-1, and failure occurs the moment a unit leaves state S-k. A unit will only go from state S-j to state Sj+1, and these immediately observed transitions occur at random times. At such transition moments a decision is required on preventive replacement of the unit, which would require preparation time. Such a decision needs to be based on inferences about the total residual time till failure. We present a method for such inferences that relies on minimal model assumptions added to data on state transitions. We illustrate the approach via simulated examples, and discuss possible use of the method and related aspects.
引用
收藏
页码:311 / 319
页数:9
相关论文
共 16 条
[1]  
[Anonymous], 1988, BAYESIAN STAT
[2]  
BERLINER LM, 1988, J AM STAT ASSOC, V83, P772, DOI 10.2307/2289303
[3]  
CHRISTER AH, 1984, J OPER RES SOC, V35, P401, DOI 10.1057/jors.1984.80
[4]   Low structure imprecise predictive inference for Bayes' problem [J].
Coolen, FPA .
STATISTICS & PROBABILITY LETTERS, 1998, 36 (04) :349-357
[5]  
Coolen FPA, 1997, QUAL RELIAB ENG INT, V13, P177, DOI 10.1002/(SICI)1099-1638(199707)13:4<177::AID-QRE97>3.0.CO
[6]  
2-R
[7]   ANALYSIS OF A 2-PHASE MODEL FOR OPTIMIZATION OF CONDITION-MONITORING INTERVALS [J].
COOLEN, FPA ;
DEKKER, R .
IEEE TRANSACTIONS ON RELIABILITY, 1995, 44 (03) :505-511
[8]  
de Finetti B., 1974, THEORY PROBABILITY, V1-2, DOI [10.1090/S0002-9904-1977-14188-8 PII, DOI 10.1090/S0002-9904-1977-14188-8PII]
[9]  
GEISSER S, 1993, PREDICTIVE INTERFENC