Automated Optimization for the Production Scheduling of Prefabricated Elements Based on the Genetic Algorithm and IFC Object Segmentation

被引:13
|
作者
Xu, Zhao [1 ]
Wang, Xiang [1 ]
Rao, Zezhi [1 ]
机构
[1] Southeast Univ, Sch Civil Engn, Dept Construct & Real Estate, Nanjing 210000, Peoples R China
基金
中国国家自然科学基金;
关键词
prefabrication; IFC standard; production schedule; segmentation; genetic algorithm; BIM; CONSTRUCTION; FRAMEWORK; LEVEL; MODEL;
D O I
10.3390/pr8121593
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Background: With the ever-increasing availability of data and a higher level of automation and simulation, production scheduling in the factory for prefabrication can no longer be seen as an autonomous solution. Concepts such as building information modelling (BIM), graphic techniques, databases, and interface development as well as heightened emphasis on overall-process optimization topics increase the pressure to connect to and interact with interrelated tasks and procedures. Methods: The automated optimization framework detailed in this study intended to generate optimal schedule of prefabricated component production based on the manufacturing process model and genetic algorithm method. An extraction and segmentation approach based on industry foundation classes (IFC) for prefabricated component production is discussed. During this process, the position and geometric information of the prefabricated components are adjusted and output in the extracted IFC file. Then, the production process and the completion time of each process have been examined and simulated with the genetic algorithm. Lastly, the automated optimization solution can be formed by the linking production scheduling database and the computational environment. Results: This shows that the implementation of the automated optimization framework for the production scheduling of the prefabricated elements improves the operability and accuracy of the production process. Conclusions: Based on the integration technique discussed above, the data transmission and integration in the mating application program is achieved by linking the Python-based application, the Structured Query Language (SQL) database and the computational environment. The implementation of the automated optimization framework model enables BIM models to play a better foundational role in patching up the technical gaps between prefabricated building designers and element producers.
引用
收藏
页码:1 / 25
页数:24
相关论文
共 50 条
  • [41] A Fast-Automated Scheduling Method Based on Genetic Algorithm for Final Assembly Workshop
    Zeng, Xiangwei
    Luo, Liangchuan
    Huang, Bingkun
    Dou, Rongrong
    Zhuang, Jianjun
    Zheng, Tianye
    Chen, Yangfan
    Da, Yuwen
    2020 IEEE 6TH INTERNATIONAL CONFERENCE ON CONTROL SCIENCE AND SYSTEMS ENGINEERING (ICCSSE), 2019, : 243 - 247
  • [42] Research on Optimization of Flight Scheduling Problem Based on the Combination of Ant Colony Optimization and Genetic Algorithm
    Liang, Wenkuai
    Li, Yi
    2014 5TH IEEE INTERNATIONAL CONFERENCE ON SOFTWARE ENGINEERING AND SERVICE SCIENCE (ICSESS), 2014, : 296 - 299
  • [43] Product Scheduling Optimization under Resource Constraints based on Improved Genetic Algorithm
    Liu, Hang
    Jia, Wen
    Zhang, Ruijia
    PROCEEDINGS OF 2024 INTERNATIONAL CONFERENCE ON MACHINE INTELLIGENCE AND DIGITAL APPLICATIONS, MIDA2024, 2024, : 392 - 400
  • [44] Optimization of Cloud Database Route Scheduling Based on Combination of Genetic Algorithm and Ant Colony Algorithm
    Zhang Yan-hua
    Feng Lei
    Yang Zhi
    CEIS 2011, 2011, 15
  • [45] Research on optimization of multi stage yard crane scheduling based on genetic algorithm
    Dingyou Lei
    Peng Zhang
    Yinggui Zhang
    Yangkun Xia
    Shuo Zhao
    Journal of Ambient Intelligence and Humanized Computing, 2020, 11 : 483 - 494
  • [46] A GENETIC ALGORITHM-BASED APPROACH FOR OPTIMIZATION OF SCHEDULING IN JOB SHOP ENVIRONMENT
    Ritwik, Kumar
    Deb, Sankha
    JOURNAL OF ADVANCED MANUFACTURING SYSTEMS, 2011, 10 (02) : 223 - 240
  • [47] Collaborative Optimization Scheduling of Cloud Service Resources Based on Improved Genetic Algorithm
    Liu, Shaojie
    Wang, Ning
    IEEE ACCESS, 2020, 8 : 150878 - 150890
  • [48] Research on optimization of multi stage yard crane scheduling based on genetic algorithm
    Lei, Dingyou
    Zhang, Peng
    Zhang, Yinggui
    Xia, Yangkun
    Zhao, Shuo
    JOURNAL OF AMBIENT INTELLIGENCE AND HUMANIZED COMPUTING, 2020, 11 (02) : 483 - 494
  • [49] Stochastic Health Examination Scheduling Problem based on Genetic Algorithm and Simulation Optimization
    Liu, Dan
    Geng, Na
    2020 IEEE 7TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND APPLICATIONS (ICIEA 2020), 2020, : 620 - 624
  • [50] Resource allocation and scheduling problem based on genetic algorithm and ant colony optimization
    Wang, Su
    Meng, Bo
    ADVANCES IN KNOWLEDGE DISCOVERY AND DATA MINING, PROCEEDINGS, 2007, 4426 : 879 - +