The optimum route problem by genetic algorithm for loading/unloading of yard crane

被引:30
作者
Huang, Youfang [1 ]
Liang, Chengji [1 ]
Yang, Yang [2 ]
机构
[1] Shanghai Maritime Univ, Shanghai 200135, Peoples R China
[2] Waseda Univ, Grad Sch Informat Prod & Syst, Fukuoka 8080135, Japan
关键词
Automatic container crane; Genetic algorithm; Route planning; Loading/unloading of yard crane; Optimum route; DEPLOYMENT;
D O I
10.1016/j.cie.2008.09.035
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In recent years, the scale of container transportation and the size of vessels are becoming larger and larger; development Of automatic container cranes becomes a necessity. As a key function of automatic control of unmanned cranes, the optimum route can minimize the cycle time by calculating the most efficient combination of horizontal and vertical motions of container loading/unloading. In this study, we have comprehensively studied various issues in the route planning in different fields. Later, the mathematical model based oil the problem analysis of loading/unloading process was presented. Particularly, to solve the problem, an optimum route method based on genetic algorithm, which satisfies the criteria such its length, smooth degree and safety distance, was developed. Finally, the computational experiments testified the effectiveness of the algorithm and explored a new way to increase the efficiency of container loading/unloading process. (C) 2009 Published by Elsevier Ltd.
引用
收藏
页码:993 / 1001
页数:9
相关论文
共 11 条
[1]   Motion planning and control of gantry cranes in cluttered work environment [J].
Blajer, W. ;
Kolodziejczyk, K. .
IET CONTROL THEORY AND APPLICATIONS, 2007, 1 (05) :1370-1379
[2]  
Colorni A., 1991, Distributed optimization by ant colonies, V142, P134
[3]  
Dijkstra E. W., 1959, NUMER MATH, V1, P269, DOI [10.1007/BF01386390, DOI 10.1007/BF01386390]
[4]  
Gen M., 1997, GENETIC ALGORITHM EN
[5]  
GEN M, 2000, GEN ALGORITHMS ENG O
[6]  
LIANG CJ, 2007, INT C IML, P439
[7]  
LIN L, 2007, INT C IML, P64
[8]   Rubber tired gantry crane deployment for container yard operation [J].
Linn, R ;
Liu, JY ;
Wan, YW ;
Zhang, CQ ;
Murty, KG .
COMPUTERS & INDUSTRIAL ENGINEERING, 2003, 45 (03) :429-442
[9]   Crane scheduling in container yards with inter-crane interference [J].
Ng, WC .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 164 (01) :64-78
[10]  
PARK NK, 2007, WSEAS INT C COMP ENG, P360