Test results from a CO2 extraction pilot plant at boundary dam coal-fired power station

被引:57
作者
Wilson, M [1 ]
Tontiwachwuthikul, P
Chakma, A
Idem, R
Veawab, A
Aroonwilas, A
Gelowitz, D
Barrie, J
Mariz, C
机构
[1] Univ Regina, Int Test Ctr CO2 Capture, Regina, SK S4S 0A2, Canada
[2] Univ Waterloo, Waterloo, ON N2L 3G1, Canada
[3] Fluor Canada, Calgary, AB T2X 3R4, Canada
[4] Fluor Daniel, Aliso Viejo, CA 92698 USA
关键词
D O I
10.1016/j.energy.2004.03.085
中图分类号
O414.1 [热力学];
学科分类号
摘要
A CO2 extraction pilot plant adjacent to SaskPower's boundary dam power station (BDPS) was re-commissioned in the Fall of 2000 and has since been in operation to process 14 x 10(3) m(3) /day (500,000 SCFD) of flue gases, and capture up to 4 ton of carbon dioxide (CO2) per day. This facility is being used for testing and demonstrating the potential of various CO2 capture technologies. This pilot plant has provided us with the capability to evaluate the performance and reliability of proprietary CO2 solvent extraction technologies as well as to obtain the much needed engineering data that can used for the design of commercial scale CO2 absorption units. A series of tests have been carried out over a reasonably long testing period with a monoethanolamine (MEA) based solvent (i.e. Fluor's Econamine FG(SM) technology). Valuable information was obtained both in design and operational aspects. This paper provides details of the test facilities at the Boundary Dam CO2 pilot plant and discusses the results obtained in terms of the absorption performance, or mass-transfer efficiency of the process, under ranges of typical operating conditions including energy consumption for solvent regeneration. It also discusses operational problems such as solvent degradation, levels of heat-stable salts, as well as corrosion in the CO2 plant. (C) 2004 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1259 / 1267
页数:9
相关论文
empty
未找到相关数据