Effects of High Pressure-Dependent Leakoff and High Process-Zone Stress in Coal-Stimulation Treatments

被引:8
作者
Ramurthy, Muthukumarappan [1 ]
Lyons, Bill
Hendrickson, Randall B. [2 ]
Barree, Robert D.
Magill, Douglas R. [3 ,4 ]
机构
[1] Halliburton, Tech Team, Denver, CO USA
[2] XTO Energy, San Juan Div, Farmington, NM USA
[3] Halliburton, San Juan Basin, Well Construct Dept, Farmington, NM USA
[4] Halliburton, San Juan Basin, Prod Enhancement Dept, Farmington, NM USA
来源
SPE PRODUCTION & OPERATIONS | 2009年 / 24卷 / 03期
关键词
D O I
10.2118/107971-PA
中图分类号
TE [石油、天然气工业];
学科分类号
0820 ;
摘要
Hydraulic fracturing in coals has been studied extensively over the last two decades; however, there are factors that were often ignored or incorrectly diagnosed, resulting in screenouts. Assuming that a majority of the perforations are open and there are no problems with the stimulation fluids, screenouts during coal hydraulic-fracture treatments can be attributed to either high pressure-dependent leakoff (PDL), high process-zone stress (PZS) or in some cases both. The objective of this work is to discuss, help identify, and present solutions to address these reservoir-related issues such that screenouts can be avoided in optimized refracture treatments and new well Stimulations. The tools for identifying these reservoir-related parameters include a diagnostic fracture-injection test (DFIT) and a grid-oriented fully functional 3D fracture simulator with shear decoupling. An example for each respective case is presented in this paper. In the first example, in which high PZS was considered to be the dominant reason for screenout or pressure out, the well was restimulated successfully by implementing the solutions presented in this paper. In the second example, in which high PDL was considered to be the main reason for screenout, there were several wells in the same project area that exhibited the same behavior resulting in screenouts. After implementing the solutions presented in this paper to address high PDL, all new wells were stimulated successfully without any issues.
引用
收藏
页码:407 / 414
页数:8
相关论文
共 8 条
  • [1] Barree R.D., 1996, SPE 36424 MS PRESENT, DOI [DOI 10.2118/36424-MS, 10.2118/36424- MS.]
  • [2] Barree R.D., 1998, SPE ROCKY MOUNTAIN R, DOI DOI 10.2118/39932-MS
  • [3] Castillo J. L., 1987, PAPER PRESENTED SPED, DOI [10.2118/16417-MS, DOI 10.2118/16417-MS]
  • [4] CONWAY MW, 1997, INT COALB METH S TUS
  • [5] *COR LAB, 2005, WINGOHFER 2005 SPI
  • [6] *COR LAB, 2005, WINGOHFER US MAN VER
  • [7] RAMURTHY M, 2006, 2006 INT COALB METH
  • [8] SHLYAPOBERSKY J, 1994, ROCK MECH PETR ENG D