A heuristic for scheduling to minimize the sum of weighted flowtime of jobs in a flowshop with sequence-dependent setup times of jobs

被引:18
|
作者
Rajendran, C [1 ]
Ziegler, H [1 ]
机构
[1] UNIV PASSAU,FAC BUSINESS ADM & ECON,D-94030 PASSAU,GERMANY
关键词
scheduling; flowshop; sequence-dependent setup times; weighted flowtime; heuristics;
D O I
10.1016/S0360-8352(97)00093-4
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The problem of scheduling in a static flowshop with sequence-dependent setup times of jobs (FSDS) is considered in this paper. A new heuristic to minimize the sum of weighted flowtime of jobs in a FSDS is proposed. An improvement scheme is supplemented to enhance the quality of the heuristic solution. An extensive computational performance analysis has shown that the proposed heuristic is computationally faster and more effective in yielding solutions of better quality than the existing heuristic. An interesting observation is that even though the proposed heuristic aims to minimize the sum of weighted flowtime of jobs (just like the existing heuristic), it fares much better than the existing heuristic in minimizing the maximum weighted flowtime of a job too. (C) 1997 Elsevier Science Ltd.
引用
收藏
页码:281 / 284
页数:4
相关论文
共 50 条
  • [41] Scheduling deteriorating jobs on a single serial-batching machine with multiple job types and sequence-dependent setup times
    Jun Pei
    Xinbao Liu
    Panos M. Pardalos
    Wenjuan Fan
    Shanlin Yang
    Annals of Operations Research, 2017, 249 : 175 - 195
  • [42] Scheduling multi-staged jobs on parallel identical machines and a central server with sequence-dependent setup times: An application to an automated kitchen
    Belieres, Simon
    Adulyasak, Yossiri
    Cordeau, Jean-Francois
    COMPUTERS & OPERATIONS RESEARCH, 2023, 160
  • [43] Scheduling families of jobs with setup times
    Liaee, MM
    Emmons, H
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1997, 51 (03) : 165 - 176
  • [44] Single machine scheduling with past-sequence-dependent setup times and deteriorating jobs
    Zhao, Chuanli
    Tang, Hengyong
    COMPUTERS & INDUSTRIAL ENGINEERING, 2010, 59 (04) : 663 - 666
  • [45] Scheduling stochastic jobs on a single machine to minimize weighted number of tardy jobs
    Soroush, H. M.
    KUWAIT JOURNAL OF SCIENCE, 2013, 40 (01) : 123 - 147
  • [46] A Hybrid Genetic Algorithm for the Distributed Permutation Flowshop Scheduling Problem with Sequence-Dependent Setup Times
    Huang, Jiangping
    Pan, Quanke
    Chen, Qingda
    2019 3RD INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE APPLICATIONS AND TECHNOLOGIES (AIAAT 2019), 2019, 646
  • [47] A discrete multi-objective fireworks algorithm for flowshop scheduling with sequence-dependent setup times
    He, Lijun
    Li, Wenfeng
    Zhang, Yu
    Cao, Yulian
    SWARM AND EVOLUTIONARY COMPUTATION, 2019, 51
  • [48] Metaheuristics for Solving a Hybrid Flexible Flowshop Problem with Sequence-Dependent Setup Times
    Sioud, Aymen
    Gagne, Caroline
    Gravel, Marc
    SWARM INTELLIGENCE BASED OPTIMIZATION (ICSIBO 2014), 2014, 8472 : 9 - 25
  • [49] Scheduling flexible flow lines with sequence-dependent setup times
    Kurz, ME
    Askin, RG
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 159 (01) : 66 - 82
  • [50] A SAVINGS INDEX HEURISTIC ALGORITHM FOR FLOWSHOP SCHEDULING WITH SEQUENCE-DEPENDENT SET-UP TIMES
    DAS, SR
    GUPTA, JND
    KHUMAWALA, BM
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1995, 46 (11) : 1365 - 1373