A heuristic for scheduling to minimize the sum of weighted flowtime of jobs in a flowshop with sequence-dependent setup times of jobs

被引:18
|
作者
Rajendran, C [1 ]
Ziegler, H [1 ]
机构
[1] UNIV PASSAU,FAC BUSINESS ADM & ECON,D-94030 PASSAU,GERMANY
关键词
scheduling; flowshop; sequence-dependent setup times; weighted flowtime; heuristics;
D O I
10.1016/S0360-8352(97)00093-4
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The problem of scheduling in a static flowshop with sequence-dependent setup times of jobs (FSDS) is considered in this paper. A new heuristic to minimize the sum of weighted flowtime of jobs in a FSDS is proposed. An improvement scheme is supplemented to enhance the quality of the heuristic solution. An extensive computational performance analysis has shown that the proposed heuristic is computationally faster and more effective in yielding solutions of better quality than the existing heuristic. An interesting observation is that even though the proposed heuristic aims to minimize the sum of weighted flowtime of jobs (just like the existing heuristic), it fares much better than the existing heuristic in minimizing the maximum weighted flowtime of a job too. (C) 1997 Elsevier Science Ltd.
引用
收藏
页码:281 / 284
页数:4
相关论文
共 50 条
  • [31] Scheduling Jobs on Parallel Machines with Sequence-Dependent Setup Times, Precedence Constraints, and Ready Times Using Variable Neighborhood Search
    Driessel, Rene
    Moench, Lars
    CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 273 - 278
  • [32] Non-permutation flowshop scheduling in a supply chain with sequence-dependent setup times
    Mehravaran, Yasaman
    Logendran, Rasaratnam
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 135 (02) : 953 - 963
  • [33] Heuristics for the mixed no-idle flowshop with sequence-dependent setup times
    Rossi, Fernando Luis
    Nagano, Marcelo Seido
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2021, 72 (02) : 417 - 443
  • [34] AN EFFICIENT HEURISTIC APPROACH TO THE SCHEDULING OF JOBS IN A FLOWSHOP
    RAJENDRAN, C
    CHAUDHURI, D
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 61 (03) : 318 - 325
  • [35] Comments on "A bicriteria m-machine flowshop scheduling with sequence-dependent setup times"
    Xu, Dehua
    Yin, Yunqiang
    APPLIED MATHEMATICAL MODELLING, 2011, 35 (07) : 3639 - 3643
  • [36] Green permutation flowshop scheduling problem with sequence-dependent setup times: a case study
    Ramezanian, Reza
    Vali-Siar, Mohammad Mahdi
    Jalalian, Mahdi
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (10) : 3311 - 3333
  • [37] Machine Scheduling with Sequence-dependent Setup Times using a Randomized Search Heuristic
    Montoya-Torres, Jairo R.
    Soto-Ferrari, Milton
    Gonzalez-Solano, Fernando
    Alfonso-Lizarazo, Edgar H.
    CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 28 - +
  • [38] Modeling and scheduling open shops with sequence-dependent setup times to minimize total completion time
    Naderi, Bahman
    Ghomi, S. M. T. Fatemi
    Aminnayeri, M.
    Zandieh, M.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 53 (5-8) : 751 - 760
  • [39] Scheduling deteriorating jobs on a single serial-batching machine with multiple job types and sequence-dependent setup times
    Pei, Jun
    Liu, Xinbao
    Pardalos, Panos M.
    Fan, Wenjuan
    Yang, Shanlin
    ANNALS OF OPERATIONS RESEARCH, 2017, 249 (1-2) : 175 - 195
  • [40] A bicriteria scheduling with sequence-dependent setup times
    Eren, Tamer
    Guner, Ertan
    APPLIED MATHEMATICS AND COMPUTATION, 2006, 179 (01) : 378 - 385