共 50 条
- [5] Scheduling jobs on dynamic parallel machines with sequence-dependent setup times The International Journal of Advanced Manufacturing Technology, 2010, 47 : 773 - 781
- [6] Scheduling jobs on dynamic parallel machines with sequence-dependent setup times INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 47 (5-8): : 773 - 781
- [9] A heuristic algorithm for identical parallel machine scheduling: splitting jobs, sequence-dependent setup times, and limited setup operators Flexible Services and Manufacturing Journal, 2021, 33 : 992 - 1026
- [10] Branch-and-bound algorithms for scheduling in permutation flowshops to minimize the sum of weighted flowtime/sum of weighted tardiness/sum of weighted flowtime and weighted tardiness/sum of weighted flowtime, weighted tardiness and weighted earliness of jobs JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2009, 60 (07) : 991 - 1004