An integrated and dynamic multi-object trade-off mechanism model based on process management in software project

被引:0
作者
Yin, Pu-Hui [1 ]
机构
[1] Hunan Univ Technol, Sch Comp, Zhuzhou 412008, Peoples R China
来源
PROCEEDINGS OF 2006 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7 | 2006年
关键词
software project; software item management; process management; multi-object; dynamic trade-off;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Aiming at practical requirements of present software project management and control, the paper presented to construct integrated multi-object trade-off model based on software project process management, so as to actualize integrated and dynamic trade-oil of the multi-object system of project. Based on analyzing basic principle of dynamic controlling and integrated multi-object trade-off system process, the paper integrated method of cybernetics and network technology, through monitoring on some critical reference points according to the control objects, emphatically discussed the integrated and dynamic multi-object trade-off model and corresponding rules and mechanism in order to realize integration of process management and trade-off of multi-object system.
引用
收藏
页码:131 / +
页数:2
相关论文
共 7 条
[1]  
Atkinson R., 1999, INT J PROJ MANAG, V17, P337, DOI [DOI 10.1016/S0263-7863(98)00069-6, 10.1016/S0263-7863(98)00069-6]
[2]   Project management with time, cost, and quality considerations [J].
Babu, AJG ;
Suresh, N .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 88 (02) :320-327
[3]  
DUAN GJ, 2002, ASIA J QUALITY, V3, P93
[4]  
JIANG WJ, 2004, CONTROL THROE APPL, V28, P82
[5]  
Kaganov M, 2003, QUAL PROG, V36, P27
[6]   IT-driven quality benchmarking for competitive advantage [J].
Srividya, A ;
Metri, BA .
IETE TECHNICAL REVIEW, 2001, 18 (01) :17-21
[7]  
YANG F Q, 2002, ACTA ELECT SINICA, V30, P1901