OPTIMIZATION ALGORITHM SIMULATION FOR DUAL-RESOURCE CONSTRAINED JOB-SHOP SCHEDULING

被引:9
|
作者
Zhong, Q. [1 ]
Yang, H. [2 ]
Tang, T. [1 ]
机构
[1] Dongbei Univ Finance & Econ, Sch Management Sci & Engn, Dalian 116025, Peoples R China
[2] Dalian Maritime Univ, Sch Informat Sci & Technol, Dalian 116026, Peoples R China
基金
中国国家自然科学基金;
关键词
Job-Shop Scheduling; Dual-Resource Constraints (DRCs); Compressed Time-Window Scheduling Strategy; Improved Branch Population Genetic Algorithm; Elite Evolution; PARTICLE SWARM OPTIMIZATION; GENETIC ALGORITHM; DESIGN; MODEL;
D O I
10.2507/IJSIMM17(1)CO2
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This research aims to optimize the job-shop scheduling constrained by manpower and machine under complex manufacturing conditions. To this end, a branch population genetic algorithm was presented based on compressed time-window scheduling strategy, and optimized with elite evolution and fan-shaped roulette operator. Specifically, the compressed time-window scheduling strategy was proposed to meet the two optimization targets: the maximum makespan and the total processing cost. Then, the elite evolution and fan-shaped roulette operator were introduced to simplify the global and local search, enhance the capacity of branch population genetic algorithm, and suppress the early elimination of inferior solutions, thus preventing the algorithm from falling into the local optimal solution. Finally, the rationality and feasibility of the proposed algorithm were verified through a simulation test. The simulation results show that the proposed algorithm lowered the maximum makespan and total processing cost by 7.4 % and 4.7 %, respectively, from the level of the original branch population genetic algorithm. This means the compressed time-window scheduling strategy can significantly optimize the makespan and the cost, as well as the robustness and global search ability.
引用
收藏
页码:147 / 158
页数:12
相关论文
共 50 条
  • [41] JOB-SHOP SCHEDULING UNDER A NONRENEWABLE RESOURCE CONSTRAINT
    TOKER, A
    KONDAKCI, S
    ERKIP, N
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1994, 45 (08) : 942 - 947
  • [42] Research on job-shop scheduling problem based on genetic algorithm
    Jia, Zhenyuan
    Lu, Xiaohong
    Yang, Jiangyuan
    Jia, Defeng
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (12) : 3585 - 3604
  • [43] Scheduling a dual-resource flexible job shop with makespan and due date-related criteria
    Andrade-Pineda, Jose L.
    Canca, David
    Gonzalez-R, Pedro L.
    Calle, M.
    ANNALS OF OPERATIONS RESEARCH, 2020, 291 (1-2) : 5 - 35
  • [44] OPTIMIZATION AND SIMULATION OF JOB-SHOP SUPPLY CHAIN SCHEDULING IN MANUFACTURING ENTERPRISES BASED ON PARTICLE SWARM OPTIMIZATION
    Liao, J.
    Lin, C.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2019, 18 (01) : 187 - 196
  • [45] A Genetic Algorithm for the Dual Resource Constrained Flexible Job Shop Scheduling Problem Considering Preparation Times
    Fan, Di
    Wang, Chuang
    2024 12TH INTERNATIONAL CONFERENCE ON TRAFFIC AND LOGISTIC ENGINEERING, ICTLE 2024, 2024, : 128 - 132
  • [46] A Study of Flexible Job-Shop Scheduling with Dual Constraints
    Gao, Zhenhua
    Qiao, Hengyun
    PROCESSES, 2024, 12 (12)
  • [47] An effective algorithm for flexible assembly job-shop scheduling with tight job constraints
    Lin, Wenhui
    Deng, Qianwang
    Han, Wenwu
    Gong, Guiliang
    Li, Kexin
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2022, 29 (01) : 496 - 525
  • [48] A Novel Hybrid Whale Optimization Algorithm for Flexible Job-Shop Scheduling Problem
    Yang, Wenqiang
    Su, Jinzhe
    Yao, Yunhang
    Yang, Zhile
    Yuan, Ying
    MACHINES, 2022, 10 (08)
  • [49] AHOA: Adaptively Hybrid Optimization Algorithm for Flexible Job-shop Scheduling Problem
    Ye, Jiaxin
    Xu, Dejun
    Hong, Haokai
    Lai, Yongxuan
    Jiang, Min
    ALGORITHMS AND ARCHITECTURES FOR PARALLEL PROCESSING, ICA3PP 2021, PT I, 2022, 13155 : 271 - 287
  • [50] Research on Optimization of Job-Shop Operative Plan Based on Genetic Scheduling Algorithm
    Qian Lixiu
    Yi Shuping
    PROCEEDINGS OF THE 15TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A-C, 2008, : 2128 - 2132