OPTIMIZATION ALGORITHM SIMULATION FOR DUAL-RESOURCE CONSTRAINED JOB-SHOP SCHEDULING

被引:9
|
作者
Zhong, Q. [1 ]
Yang, H. [2 ]
Tang, T. [1 ]
机构
[1] Dongbei Univ Finance & Econ, Sch Management Sci & Engn, Dalian 116025, Peoples R China
[2] Dalian Maritime Univ, Sch Informat Sci & Technol, Dalian 116026, Peoples R China
基金
中国国家自然科学基金;
关键词
Job-Shop Scheduling; Dual-Resource Constraints (DRCs); Compressed Time-Window Scheduling Strategy; Improved Branch Population Genetic Algorithm; Elite Evolution; PARTICLE SWARM OPTIMIZATION; GENETIC ALGORITHM; DESIGN; MODEL;
D O I
10.2507/IJSIMM17(1)CO2
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This research aims to optimize the job-shop scheduling constrained by manpower and machine under complex manufacturing conditions. To this end, a branch population genetic algorithm was presented based on compressed time-window scheduling strategy, and optimized with elite evolution and fan-shaped roulette operator. Specifically, the compressed time-window scheduling strategy was proposed to meet the two optimization targets: the maximum makespan and the total processing cost. Then, the elite evolution and fan-shaped roulette operator were introduced to simplify the global and local search, enhance the capacity of branch population genetic algorithm, and suppress the early elimination of inferior solutions, thus preventing the algorithm from falling into the local optimal solution. Finally, the rationality and feasibility of the proposed algorithm were verified through a simulation test. The simulation results show that the proposed algorithm lowered the maximum makespan and total processing cost by 7.4 % and 4.7 %, respectively, from the level of the original branch population genetic algorithm. This means the compressed time-window scheduling strategy can significantly optimize the makespan and the cost, as well as the robustness and global search ability.
引用
收藏
页码:147 / 158
页数:12
相关论文
共 50 条
  • [21] A Hybrid Optimization Algorithm for the Job-shop Scheduling Problem
    Zhou, Qiang
    Cui, Xunxue
    Wang, Zhengshan
    Yang, Bin
    WORLD SUMMIT ON GENETIC AND EVOLUTIONARY COMPUTATION (GEC 09), 2009, : 757 - 763
  • [22] Simulation and Optimization of Discrete Customized Job-shop Scheduling
    Li, Qingsong
    Qu, Dan
    ICICTA: 2009 SECOND INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION, VOL II, PROCEEDINGS, 2009, : 213 - 215
  • [23] Robust Fuzzy-Stochastic Programming Model and Meta-Heuristic Algorithms for Dual-Resource Constrained Flexible Job-Shop Scheduling Problem Under Machine Breakdown
    Soofi, Parham
    Yazdani, Mehdi
    Amiri, Maghsoud
    Adibi, Mohammad Amin
    IEEE ACCESS, 2021, 9 : 155740 - 155762
  • [24] Improved Genetic Algorithm for Job-Shop Scheduling
    程蓉
    陈幼平
    李志刚
    Journal of Southwest Jiaotong University, 2006, (03) : 223 - 227
  • [25] Threat elimination algorithm for Dual Resource Constrained Flexible Job Shop Scheduling Problems
    Magalhaes, Ricardo
    Vieira, Susana
    Sousa, Joao
    IFAC PAPERSONLINE, 2022, 55 (10): : 2288 - 2293
  • [26] Solving dual flexible job-shop scheduling problem using a Bat Algorithm
    Xu, H.
    Bao, Z. R.
    Zhang, T.
    ADVANCES IN PRODUCTION ENGINEERING & MANAGEMENT, 2017, 12 (01): : 5 - 16
  • [27] An effective approach for the dual-resource flexible job shop scheduling problem considering loading and unloading
    Wu, Xiuli
    Peng, Junjian
    Xiao, Xiao
    Wu, Shaomin
    JOURNAL OF INTELLIGENT MANUFACTURING, 2021, 32 (03) : 707 - 728
  • [28] Genetic Algorithm Design and Simulation for Job-shop Scheduling Problem
    Wang, Gui Cong
    Tian, Xi Jie
    Ll, Chuan Peng
    Yang, Na Na
    MECHATRONICS AND APPLIED MECHANICS, PTS 1 AND 2, 2012, 157-158 : 1436 - 1440
  • [29] A PARTICLE SWARM OPTIMIZATION-BASED ALGORITHM FOR JOB-SHOP SCHEDULING PROBLEMS
    Ge, H. W.
    Liang, Y. C.
    Zhou, Y.
    Guo, X. C.
    INTERNATIONAL JOURNAL OF COMPUTATIONAL METHODS, 2005, 2 (03) : 419 - 430
  • [30] Resource constraints for preemptive job-shop scheduling
    Pape C.L.E.
    Baptiste P.
    Constraints, 1998, 3 (4) : 263 - 287