Mixed model disassembly line balancing problem with fuzzy goals

被引:85
作者
Paksoy, Turan [1 ]
Gungor, Askiner [2 ]
Ozceylan, Eren [1 ]
Hancilar, Arif [2 ]
机构
[1] Selcuk Univ, Dept Ind Engn, Konya, Turkey
[2] Pamukkale Univ, Dept Ind Engn, Denizli, Turkey
关键词
disassembly; disassembly line balancing; mixed model disassembly lines; binary fuzzy goal programming; fuzzy multi-objective programming; mixed integer programming; PLANNING DECISIONS; ALGORITHM;
D O I
10.1080/00207543.2013.795251
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The collection of used products is the driving force of remanufacturing systems and enterprises can gain significant economic, technical and social benefits from recycling. All products are disassembled up to some level in remanufacturing systems. The best way to disassemble returned products is valid by a well-balanced disassembly line. In this paper, a mixed integer programming (MIP) model is proposed for a mixed model disassembly line balancing (MMDLB) problem with multiple conflicting objectives: (1) minimising the cycle time, (2) minimising the number of disassembly workstations and (3) providing balanced workload per workstation. In most real world MMDLB problems, the targeted goals of decision makers are frequently imprecise or fuzzy because some information may be incomplete and/or unavailable over the planning horizon. This study is the first in the literature to offer the binary fuzzy goal programming (BFGP) and the fuzzy multi-objective programming (FMOP) approaches for the MMDLB problem in order to take into account the vague aspirations of decision makers. An illustrative example based on two industrial products is presented to demonstrate the validity of the proposed models and to compare the performances of the BFGP and the FMOP approaches.
引用
收藏
页码:6082 / 6096
页数:15
相关论文
共 29 条
[1]   A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem [J].
Agrawal, S. ;
Tiwari, M. K. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (06) :1405-1429
[2]   Profit-oriented disassembly-line balancing [J].
Altekin, F. Tevhide ;
Kandiller, Levent ;
Ozdemirel, Nur Evin .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (10) :2675-2693
[3]   Task-failure-driven rebalancing of disassembly lines [J].
Altekin, F. Tevhide ;
Akkan, Can .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (18) :4955-4976
[4]   Binary fuzzy goal programming [J].
Chang, Ching-Ter .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 180 (01) :29-37
[5]  
Charnes A., 1961, MANAGEMENT MODEL IND
[6]   A new multi-objective ant colony algorithm for solving the disassembly line balancing problem [J].
Ding, Li-Ping ;
Feng, Yi-Xiong ;
Tan, Jian-Rong ;
Gao, Yi-Cong .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 48 (5-8) :761-771
[7]   Issues in environmentally conscious manufacturing and product recovery: a survey [J].
Gungor, A ;
Gupta, SM .
COMPUTERS & INDUSTRIAL ENGINEERING, 1999, 36 (04) :811-853
[8]   Disassembly line in product recovery [J].
Güngör, A ;
Gupta, SM .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (11) :2569-2589
[9]   An evaluation methodology for disassembly processes [J].
Gungor, A ;
Gupta, SM .
COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 33 (1-2) :329-332
[10]   A solution approach to the disassembly line balancing problem in the presence of task failures [J].
Güngör, A ;
Gupta, SM .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (07) :1427-1467