共 32 条
Groundwater Inrush Control and Parameters Optimization of Curtain Grouting Reinforcement for the Jingzhai Tunnel
被引:19
作者:
Li, Gan
[1
]
Ma, Weibin
[2
]
Tian, Siming
[3
]
Hongbo, Zhou
[4
]
Huabin, Fan
[5
]
Zou, Wenhao
[2
]
机构:
[1] Tsinghua Univ, State Key Lab Hydrosci & Engn, Beijing 100084, Peoples R China
[2] China Acad Railway Sci Grp Co Ltd, Railway Construct Res Inst, China Acad Railway Sci, Beijing 100084, Peoples R China
[3] China Railway Econ & Planning Res Inst, Beijing 100084, Peoples R China
[4] Nonferrous Geol Explorat & Res Inst Ltd Liabil Co, Shenyang 110013, Peoples R China
[5] Jiaoke Transport Consultants Ltd, Beijing 100084, Peoples R China
来源:
关键词:
WATER INRUSH;
INSIDIOUS FAULT;
MODEL;
FRACTURE;
MINE;
D O I:
10.1155/2021/6634513
中图分类号:
P3 [地球物理学];
P59 [地球化学];
学科分类号:
0708 ;
070902 ;
摘要:
Based on the systematic study on the characteristics of water and mud inrush during the excavation of Jingzhai tunnel, the mechanism of water inrush seepage transformation caused by excavation disturbance is analyzed. By means of electromagnetic geophysical prospecting, the potential water bearing area of the tunnel was analyzed. The constitutive model of rock mass and grouting parameters are considered in the numerical simulation. The law of tunnel crack initiation and expansion under different curtain grouting parameters is proposed. The characteristics of seepage water inrush caused by excavation are described. It is considered that there are three stages in the seepage characteristics of tunnel: incubation, sudden, and stable. Numerical simulation was used to analyze the crack propagation track and water inflow characteristics under the grouting thickness of 3 m, 5 m, and 7 m. When the curtain grouting thickness was 3 m, the fracture field penetrated the curtain grouting area. The dominant seepage channel is formed, which greatly increases the probability of water inrush. When the curtain thickness is 5 similar to 7 m, the expansion of the crack zone can be controlled basically, so that the fracture and water bearing rock layer cannot form a seepage channel. At last, the grouting scheme of 6 m thick grouting and 20 m advanced grouting was selected, and the water seepage was reduced by 83%.
引用
收藏
页数:10
相关论文