SCaRC: Space-constrained resource-constrained scheduling system

被引:40
|
作者
Thabet, WY
Beliveau, YJ
机构
[1] VIRGINIA POLYTECH INST & STATE UNIV,DEPT CIVIL ENGN,BLACKSBURG,VA 24061
[2] VIRGINIA POLYTECH INST & STATE UNIV,DEPT BLDG CONSTR,BLACKSBURG,VA 24061
关键词
D O I
10.1061/(ASCE)0887-3801(1997)11:1(48)
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Current intelligent scheduling systems do not address the effect of limited work space on the generation of schedules. This paper describes SCaRC-Space-Constrained and Resource-Constrained knowledge-based system-for scheduling repetitive floors in multistory projects. The prototype system incorporates space-based scheduling techniques to recognize the space requirements of activities as a scheduling constraint. The space-based techniques are integrated with resource-based techniques for the production of schedules. The system also incorporates procedures to define and verify construction logic constraints associated with linear scheduling of vertical construction. An example illustrating the scheduling techniques implemented in SCaRC is presented.
引用
收藏
页码:48 / 59
页数:12
相关论文
共 50 条
  • [41] An evolutionary algorithm for resource-constrained project scheduling
    Hindi, KS
    Yang, HB
    Fleszar, K
    IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (05) : 512 - 518
  • [42] Resource-constrained project scheduling by simulated annealing
    Boctor, FF
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (08) : 2335 - 2351
  • [43] Intelligent scheduling and optimisation for resource-constrained networks
    Li, Z.
    Wang, W.
    Jiang, Y.
    IET CONTROL THEORY AND APPLICATIONS, 2010, 4 (12): : 2982 - 2992
  • [44] Design of space resource constrained project scheduling system
    Liu Huanyu
    Wen Tianyu
    2015 SEVENTH INTERNATIONAL CONFERENCE ON MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION (ICMTMA 2015), 2015, : 366 - 369
  • [45] Chaotic vibrating particles system for resource-constrained project scheduling problem
    Kaveh, A.
    Vazirinia, Y.
    SCIENTIA IRANICA, 2020, 27 (04) : 1826 - 1842
  • [46] PRAC: A Software System to Solve the Resource-constrained Project Scheduling Problem
    Zhang, Mao-sheng
    Zhao, Ying
    Cao, Bo
    2016 INTERNATIONAL CONFERENCE ON BUSINESS AND MANAGEMENT (ICBM 2016), 2016, : 37 - 42
  • [47] A Novel Feedback Scheduling Approach for Resource-constrained Network Control System
    Qi-Zhang
    Tang, Xian-ming
    Yu, Jin-shou
    NCM 2008 : 4TH INTERNATIONAL CONFERENCE ON NETWORKED COMPUTING AND ADVANCED INFORMATION MANAGEMENT, VOL 1, PROCEEDINGS, 2008, : 73 - 78
  • [48] Flexible Scheduling Approach for Resource-Constrained Project Scheduling Problems
    Liu, Shixin
    Tukel, Oya I.
    Rom, W.
    2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 3522 - +
  • [49] STRENGTH AND ADAPTABILITY OF PROBLEM-SPACE BASED NEIGHBORHOODS FOR RESOURCE-CONSTRAINED SCHEDULING
    LEON, VJ
    BALAKRISHNAN, R
    OR SPEKTRUM, 1995, 17 (2-3) : 173 - 182
  • [50] Space-Constrained Interval Selection
    Emek, Yuval
    Halldorsson, Magnus M.
    Rosen, Adi
    AUTOMATA, LANGUAGES, AND PROGRAMMING, ICALP 2012 PT I, 2012, 7391 : 302 - 313