SCaRC: Space-constrained resource-constrained scheduling system

被引:40
|
作者
Thabet, WY
Beliveau, YJ
机构
[1] VIRGINIA POLYTECH INST & STATE UNIV,DEPT CIVIL ENGN,BLACKSBURG,VA 24061
[2] VIRGINIA POLYTECH INST & STATE UNIV,DEPT BLDG CONSTR,BLACKSBURG,VA 24061
关键词
D O I
10.1061/(ASCE)0887-3801(1997)11:1(48)
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Current intelligent scheduling systems do not address the effect of limited work space on the generation of schedules. This paper describes SCaRC-Space-Constrained and Resource-Constrained knowledge-based system-for scheduling repetitive floors in multistory projects. The prototype system incorporates space-based scheduling techniques to recognize the space requirements of activities as a scheduling constraint. The space-based techniques are integrated with resource-based techniques for the production of schedules. The system also incorporates procedures to define and verify construction logic constraints associated with linear scheduling of vertical construction. An example illustrating the scheduling techniques implemented in SCaRC is presented.
引用
收藏
页码:48 / 59
页数:12
相关论文
共 50 条
  • [1] Search space decomposition for resource-constrained project scheduling
    Liu, Zhenyuan
    Hua, Zhengming
    Yang, Liu
    Deng, Raoyi
    AUTOMATION IN CONSTRUCTION, 2022, 134
  • [2] Scheduling of resource-constrained projects
    Zilinskas, A
    INTERFACES, 2001, 31 (04) : 133 - 135
  • [3] RESOURCE-CONSTRAINED ASSIGNMENT SCHEDULING
    MAZZOLA, JB
    NEEBE, AW
    OPERATIONS RESEARCH, 1986, 34 (04) : 560 - 572
  • [4] HEURISTICS FOR RESOURCE-CONSTRAINED SCHEDULING
    ELSAYED, EA
    NASR, NZ
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1986, 24 (02) : 299 - 310
  • [5] Scheduling of resource-constrained projects
    Wilson, J
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2001, 52 (07) : 846 - 846
  • [6] Problem space search algorithms for resource-constrained project scheduling
    Naphade, KS
    Wu, SD
    Storer, RH
    ANNALS OF OPERATIONS RESEARCH, 1997, 70 (0) : 307 - 326
  • [7] Problem space search algorithms for resource-constrained project scheduling
    Kedar S. Naphade
    S. David Wu
    Robert H. Storer
    Annals of Operations Research, 1997, 70 : 307 - 326
  • [8] The Complexity Landscape of Resource-Constrained Scheduling
    Ganian, Robert
    Hamm, Thekla
    Mescoff, Guillaume
    PROCEEDINGS OF THE TWENTY-NINTH INTERNATIONAL JOINT CONFERENCE ON ARTIFICIAL INTELLIGENCE, 2020, : 1741 - 1747
  • [9] Performance of Resource-Constrained Scheduling Heuristics
    Franco-Duran, Diana M.
    de la Garza, Jesus M.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (04)
  • [10] Disorder considerations in resource-constrained scheduling
    Christodoulou, Symeon E.
    Ellinas, Georgios N.
    Aslani, Pooyan
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (03) : 229 - 240