Combining just-in-time modelling and batch-wise unfolded PLS model for the derivative-free batch-to-batch optimization

被引:6
作者
Jia, Runda [1 ,2 ]
Mao, Zhizhong [1 ,2 ]
Wang, Fuli [1 ,2 ]
机构
[1] Northeastern Univ, Sch Informat Sci Engn, Shenyang 110004, Liaoning, Peoples R China
[2] Northeastern Univ, State Key Lab Synthet Automat Proc Ind, Shenyang 110004, Liaoning, Peoples R China
基金
中国国家自然科学基金;
关键词
batch process; batch-to-batch optimization; just-in-time modelling; trust-region framework; PARTIAL LEAST-SQUARES; ITERATIVE LEARNING CONTROL; LATENT VARIABLE MODELS; PRODUCT QUALITY; CRYSTALLIZATION PROCESSES; DYNAMIC OPTIMIZATION; ALGORITHMS; REGRESSION; STRATEGY;
D O I
10.1002/cjce.23050
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
In this work, a derivative-free batch-to-batch optimization method is proposed. In order to conquer the difficulties in building a first principal model, a local batch-wise unfolded PLS (BW-PLS) model is used to accurately describe the concerned region, and the first principal model based dynamic optimization problem is transformed into a static one. The just-in-time (JIT) modelling method is employed to dynamically update the local BW-PLS model upon request, and the nonlinearity and abrupt changes from one batch run to another can be effectively resolved. Then the proposed local BW-PLS model with JIT modelling method is integrated into the trust-region framework. Not only can the issue of plant-model mismatch be dealt with, but also the computation of the experimental gradients can be avoided. In addition, taking the advantages of PLS regression, the Hotelling's T-2 statistic is utilized as a hard constraint to ensure the reliability of the optimal solution. Extension to handle soft inequality constraints is also included in this work. Finally, the efficacy of the proposed batch-to-batch optimization method is illustrated via a toy example and a simulated cobalt oxalate synthesis process under different operating conditions, and satisfied optimization performances were obtained.
引用
收藏
页码:1156 / 1167
页数:12
相关论文
共 32 条
[1]   A trust-region framework for constrained optimization using reduced order modeling [J].
Agarwal, Anshul ;
Biegler, Lorenz T. .
OPTIMIZATION AND ENGINEERING, 2013, 14 (01) :3-35
[2]   Data-driven model predictive quality control of batch processes [J].
Aumi, Siam ;
Corbett, Brandon ;
Clarke-Pringle, Tracy ;
Mhaskar, Prashant .
AICHE JOURNAL, 2013, 59 (08) :2852-2861
[3]   Control and optimization of batch processes [J].
Bonvin, Dominique ;
Srinivasan, Bala ;
Hunkeler, David .
IEEE CONTROL SYSTEMS MAGAZINE, 2006, 26 (06) :34-45
[4]   Self-tuning run to run optimization of fed-batch processes using unfold-PLS [J].
Camacho, Jose ;
Pico, Jesus ;
Ferrer, Alberto .
AICHE JOURNAL, 2007, 53 (07) :1789-1804
[5]   GLOBAL CONVERGENCE OF GENERAL DERIVATIVE-FREE TRUST-REGION ALGORITHMS TO FIRST- AND SECOND-ORDER CRITICAL POINTS [J].
Conn, Andrew R. ;
Scheinberg, Katya ;
Vicente, Luis N. .
SIAM JOURNAL ON OPTIMIZATION, 2009, 20 (01) :387-415
[6]  
Dong D., 1996, IND ENG CHEM RES, V35, P1030
[7]   Hybrid model-based approach to batch-to-batch control of particle size distribution in emulsion polymerization [J].
Doyle, FJ ;
Harrison, CA ;
Crowley, TJ .
COMPUTERS & CHEMICAL ENGINEERING, 2003, 27 (8-9) :1153-1163
[8]   Control of batch product quality by trajectory manipulation using latent variable models [J].
Flores-Cerrillo, J ;
MacGregor, JF .
JOURNAL OF PROCESS CONTROL, 2004, 14 (05) :539-553
[9]   Iterative learning control for final batch product quality using partial least squares models [J].
Flores-Cerrillo, J ;
MacGregor, JF .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2005, 44 (24) :9146-9155
[10]   Within-batch and batch-to-batch inferential-adaptive control of semibatch reactors: A partial least squares approach [J].
Flores-Cerrillo, J ;
MacGregor, JF .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2003, 42 (14) :3334-3345