Hydropower reservoir reoperation to adapt to large-scale photovoltaic power generation

被引:83
作者
Ming, Bo [1 ,2 ]
Liu, Pan [1 ,2 ]
Guo, Shenglian [1 ,2 ]
Cheng, Lei [1 ,2 ]
Zhang, Jingwen [1 ,2 ]
机构
[1] Wuhan Univ, State Key Lab Water Resources & Hydropower Engn S, Wuhan 430072, Hubei, Peoples R China
[2] Hubei Prov Collaborat Innovat Ctr Water Resources, Wuhan 430072, Hubei, Peoples R China
基金
中国国家自然科学基金;
关键词
Hybrid energy system; Operating rules; Photovoltaic power; Hydropower; Water resources management; Multi-objective optimization; TERM OPTIMAL OPERATION; COMPLEMENTARY OPERATION; RULE CURVES; SYSTEM; OPTIMIZATION; MODEL; SOLAR; HYDROELECTRICITY; INTEGRATION; ALLOCATION;
D O I
10.1016/j.energy.2019.04.209
中图分类号
O414.1 [热力学];
学科分类号
摘要
Integrating dispatchable hydropower with nondispatchable photovoltaic (PV) power is a promising way to enhance resource use efficiency. However, hybrid generation of these energy sources may exert greater pressure on the integrated water resources management, calling for reservoir reoperation. To address this issue, we propose a procedure to derive adaptive operating rules for a large hydro PV hybrid power plant consisting of following steps: (1) establish a short-term simulation model to estimate the PV curtailment rate arising from specified long-term hydropower output, in which the relationships are represented as PV energy-loss functions to bridge long- and short-term operations; (2) design six operating rules that incorporate the PV energy-loss functions to simulate the system's long-term operation; and (3) develop a multi-objective optimization model to identify the most effective operating rules. A case study was carried out for China's Longyangxia hydro-PV hybrid power plant. Results showed that, compared with traditional operation, the average annual energy production and power supply reliability of the optimal rule curves increased to 7.3 billion kWh (4.3%) and 90% (47.5%), respectively, while the water shortage index decreased to 114 (6.6%). The derived operating rules could achieve good balance between PV integration and water management. Published by Elsevier Ltd.
引用
收藏
页码:268 / 279
页数:12
相关论文
共 50 条
[41]   The Economic Value of Hydrometeorological Information in the Planning of Large-Scale Hydropower System Operations [J].
Dalcin, Ana Paula ;
Marques, Guilherme Fernandes ;
Espanmanesh, Vahid ;
Quedi, Erik ;
Inada, Marcio Shigueaki ;
Tilmant, Amaury ;
Possantti, Ipora ;
Fan, Fernando Mainardi ;
de Paiva, Rodrigo Cauduro Dias .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2025, 151 (05)
[42]   Two methods for estimating limits to large-scale wind power generation [J].
Miller, Lee M. ;
Brunsell, Nathaniel A. ;
Mechem, David B. ;
Gans, Fabian ;
Monaghan, Andrew J. ;
Vautard, Robert ;
Keith, David W. ;
Kleidon, Axel .
PROCEEDINGS OF THE NATIONAL ACADEMY OF SCIENCES OF THE UNITED STATES OF AMERICA, 2015, 112 (36) :11169-11174
[43]   Review of Generation Schedule Methods with Large-Scale Wind Power Integration [J].
Liu Bin ;
Zhou Jingyang ;
Pan Yi ;
Li Qiang ;
Zhou Haiming ;
Ding Qiang .
2011 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2011,
[44]   Long-term complementary operation of a large-scale hydro-photovoltaic hybrid power plant using explicit stochastic optimization [J].
Li, He ;
Liu, Pan ;
Guo, Shenglian ;
Ming, Bo ;
Cheng, Lei ;
Yang, Zhikai .
APPLIED ENERGY, 2019, 238 :863-875
[45]   Economic Energy Allocation of Conventional and Large-Scale PV Power Plants [J].
El-Hafez, Omar Jouma ;
ElMekkawy, Tarek Y. ;
Kharbeche, Mohamed Bin Mokhtar ;
Massoud, Ahmed Mohammed .
APPLIED SCIENCES-BASEL, 2022, 12 (03)
[46]   Collaborative Planning of Distributed Wind Power Generation and Distribution Network with Large-scale Heat Pumps [J].
Cui, Quansheng ;
Bai, Xiaomin ;
Dong, Weijie .
CSEE JOURNAL OF POWER AND ENERGY SYSTEMS, 2019, 5 (03) :335-347
[47]   Key Operational Issues on the Integration of Large-Scale Solar Power Generation-A Literature Review [J].
Li, Wei ;
Ren, Hui ;
Chen, Ping ;
Wang, Yanyang ;
Qi, Hailong .
ENERGIES, 2020, 13 (22)
[48]   Multi-objective optimization of large-scale grid-connected photovoltaic-hydrogen-natural gas integrated energy power station based on carbon emission priority [J].
Song, Yujia ;
Mu, Hailin ;
Li, Nan ;
Wang, Hongye .
INTERNATIONAL JOURNAL OF HYDROGEN ENERGY, 2023, 48 (10) :4087-4103
[49]   Large-Scale Generation and Validation of Synthetic PMU Data [J].
Idehen, Ikponmwosa ;
Jang, Wonhyeok ;
Overbye, Thomas J. .
IEEE TRANSACTIONS ON SMART GRID, 2020, 11 (05) :4290-4298
[50]   Sizing and Placement Strategy for Integration of Large-Scale Photovoltaic Systems in Power Transmission Networks [J].
Venkatesh, Raghupatruni ;
Chandrasekhar, Perumalla ;
Bhende, Chandrasekhar Narayan .
JOURNAL OF CONTROL AUTOMATION AND ELECTRICAL SYSTEMS, 2025, 36 (03) :540-555