Multidirectional Scheduling Scheme in Resource-Constrained Project Scheduling Problem

被引:2
|
作者
Yoosefzadeh, Hamid R. [1 ,2 ]
Tareghian, Hamed R. [1 ]
Farahi, Mohammad H. [1 ]
机构
[1] Ferdowsi Univ Mashhad, Fac Math Sci, Mashhad, Iran
[2] Payam Noor Univ, Dept Math Sci, Tehran, Iran
关键词
scheduling schemes; resource complexity measures; double justification technique; tridirectional scheduling scheme; GENETIC ALGORITHM; JUSTIFICATION; OPTIMIZATION; RCPSP;
D O I
10.1002/nav.21565
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In 2000, Klein showed that bidirectional scheduling schemes (bidss) outperform single-directional scheduling schemes (e.g., forward or backward schemes). In 2010, Yoosefzadeh, et al. [J Math Model Algor 9 (2010), 357-373] showed that depending on the nature of the problems and also the type of priority rules used, schedules produced by a so-called tridirectional scheduling scheme (trdss) yields shorter makespans when compared to forward, backward, and even bidss. Since the justification technique is applied in many of the state-of-the-art algorithms nowadays, we show that the tuned version of the trdss outperforms the double justification technique. Moreover, we investigate the circumstances under which the trdss is more probable to generate schedules with shorter makespans. To this end, we introduce a new measure of resource requirements and their distributions, namely total amount of overflows. Our analytical as well as empirical investigations show that when the new measure is increased, it is more probable to obtain schedules with shorter makespans using the trdss. (c) 2013 Wiley Periodicals, Inc. Naval Research Logistics 61: 44-55, 2014
引用
收藏
页码:44 / 55
页数:12
相关论文
共 50 条
  • [21] The preemptive stochastic resource-constrained project scheduling problem
    Creemers, Stefan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 277 (01) : 238 - 247
  • [22] A reactive scheduling approach for the resource-constrained project scheduling problem with dynamic resource disruption
    Xu, Jiaojiao
    Bai, Sijun
    KYBERNETES, 2024, 53 (06) : 2007 - 2028
  • [23] Robust scheduling and optimization for resource-constrained project scheduling problem with transfer times
    Hu X.
    Liang S.
    Wang J.
    Cui N.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (12): : 4191 - 4205
  • [24] A linear-discrete scheduling model for the resource-constrained project scheduling problem
    Bonnal, Pierre
    Gourc, Didier
    Hameri, Ari-Pekka
    Lacoste, Germain
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2005, 23 (08) : 797 - 814
  • [25] AN ITERATIVE SCHEDULING TECHNIQUE FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING
    LI, KY
    WILLIS, RJ
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 56 (03) : 370 - 379
  • [26] Resource-constrained project scheduling and timetabling
    Brucker, P
    Knust, S
    PRACTICE AND THEORY OF AUTOMATED TIMETABLING III, 2001, 2079 : 277 - 293
  • [27] Algorithm for Resource-constrained Project Scheduling Problem With Resource Transfer Time
    Lu Z.-Q.
    Liu X.-Y.
    Lu, Zhi-Qiang (zhiqianglu@tongji.edu.cn), 2018, Science Press (44): : 1028 - 1036
  • [28] The Proactive Resource-Constrained Project Scheduling Problem with Resource Transfer Times
    Ma, Zhiqiang
    He, Zhengwen
    Wang, Nengmin
    PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 642 - 647
  • [29] Hybrid Heuristics for Dynamic Resource-Constrained Project Scheduling Problem
    Villela da Silva, Andre Renato
    Ochi, Luiz Satoru
    HYBRID METAHEURISTICS, 2010, 6373 : 73 - 87
  • [30] A constraint programming approach for the resource-constrained project scheduling problem
    Liess, Olivier
    Michelon, Philippe
    ANNALS OF OPERATIONS RESEARCH, 2008, 157 (01) : 25 - 36