Multidirectional Scheduling Scheme in Resource-Constrained Project Scheduling Problem

被引:2
|
作者
Yoosefzadeh, Hamid R. [1 ,2 ]
Tareghian, Hamed R. [1 ]
Farahi, Mohammad H. [1 ]
机构
[1] Ferdowsi Univ Mashhad, Fac Math Sci, Mashhad, Iran
[2] Payam Noor Univ, Dept Math Sci, Tehran, Iran
关键词
scheduling schemes; resource complexity measures; double justification technique; tridirectional scheduling scheme; GENETIC ALGORITHM; JUSTIFICATION; OPTIMIZATION; RCPSP;
D O I
10.1002/nav.21565
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In 2000, Klein showed that bidirectional scheduling schemes (bidss) outperform single-directional scheduling schemes (e.g., forward or backward schemes). In 2010, Yoosefzadeh, et al. [J Math Model Algor 9 (2010), 357-373] showed that depending on the nature of the problems and also the type of priority rules used, schedules produced by a so-called tridirectional scheduling scheme (trdss) yields shorter makespans when compared to forward, backward, and even bidss. Since the justification technique is applied in many of the state-of-the-art algorithms nowadays, we show that the tuned version of the trdss outperforms the double justification technique. Moreover, we investigate the circumstances under which the trdss is more probable to generate schedules with shorter makespans. To this end, we introduce a new measure of resource requirements and their distributions, namely total amount of overflows. Our analytical as well as empirical investigations show that when the new measure is increased, it is more probable to obtain schedules with shorter makespans using the trdss. (c) 2013 Wiley Periodicals, Inc. Naval Research Logistics 61: 44-55, 2014
引用
收藏
页码:44 / 55
页数:12
相关论文
共 50 条
  • [1] Resource-constrained project scheduling problem with reworking
    Liao Y.
    Lu Z.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (11): : 2762 - 2774
  • [2] A matheuristic for the resource-constrained project scheduling problem
    Vanhoucke, Mario
    Coelho, Jose
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 319 (03) : 711 - 725
  • [3] A SURVEY ON THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
    OZDAMAR, L
    ULUSOY, G
    IIE TRANSACTIONS, 1995, 27 (05) : 574 - 586
  • [4] Extensions of the resource-constrained project scheduling problem
    Ding, Hongyan
    Zhuang, Cunbo
    Liu, Jianhua
    AUTOMATION IN CONSTRUCTION, 2023, 153
  • [5] Flexible resource-constrained resource leveling project scheduling problem
    Yu, Xiao-Guang
    Zhan, De-Chen
    Nie, Lan-Shun
    Chu, Dian-Hui
    Xu, Xiao-Fei
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (09): : 1967 - 1976
  • [6] A POLARIZED ADAPTIVE SCHEDULE GENERATION SCHEME FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
    Zamani, Reza
    RAIRO-OPERATIONS RESEARCH, 2012, 46 (01) : 23 - 39
  • [7] A Neurogenetic approach for the resource-constrained project scheduling problem
    Agarwal, Anurag
    Colak, Selcuk
    Erenguc, Selcuk
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) : 44 - 50
  • [8] Genetic algorithm for the resource-constrained project scheduling problem
    E. N. Goncharov
    V. V. Leonov
    Automation and Remote Control, 2017, 78 : 1101 - 1114
  • [9] The proactive and reactive resource-constrained project scheduling problem
    Morteza Davari
    Erik Demeulemeester
    Journal of Scheduling, 2019, 22 : 211 - 237
  • [10] Periodically aggregated resource-constrained project scheduling problem
    Morin, Pierre-Antoine
    Artigues, Christian
    Hait, Alain
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2017, 11 (06) : 792 - 817