Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies

被引:413
作者
Taylan, Osman [1 ]
Bafail, Abdallah O. [2 ]
Abdulaal, Reda M. S. [1 ]
Kabli, Mohammed R. [1 ]
机构
[1] King Abdulaziz Univ, Fac Engn, Dept Ind Engn, Jeddah 21589, Saudi Arabia
[2] King Abdulaziz Univ Projects, Jeddah 21589, Saudi Arabia
关键词
Fuzzy modeling; Fuzzy AHP and TOPSIS; Risk management; Construction project management;
D O I
10.1016/j.asoc.2014.01.003
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Construction projects are initiated in dynamic environment which result in circumstances of high uncertainty and risks due to accumulation of many interrelated parameters. The purpose of this study is to use novel analytic tools to evaluate the construction projects and their overall risks under incomplete and uncertain situations. It was also aimed to place the risk in a proper category and predict the level of it in advance to develop strategies and counteract the high-risk factors. The study covers identifying the key risk criteria of construction projects at King Abdulaziz University (KAU), and assessing the criteria by the integrated hybrid methodologies. The proposed hybrid methodologies were initiated with a survey for data collection. The relative importance index (RII) method was applied to prioritize the project risks based on the data obtained. The construction projects were then categorized by fuzzy AHP and fuzzy TOPSIS methodologies. Fuzzy AHP( FAHP) was used to create favorable weights for fuzzy linguistic variable of construction projects overall risk. The fuzzy TOPSIS method is very suitable for solving group decision making problems under the fuzzy environment. It attempted to incorporate vital qualitative attributes in performance analysis of construction projects and transformed the qualitative data into equivalent quantitative measures. Thirty construction projects were studied with respect to five main criteria that are the time, cost, quality, safety and environment sustainability. The results showed that these novel methodologies are able to assess the overall risks of construction projects, select the project that has the lowest risk with the contribution of relative importance index. This approach will have potential applications in the future. Crown Copyright (C) 2014 Published by Elsevier B. V. All rights reserved.
引用
收藏
页码:105 / 116
页数:12
相关论文
共 42 条
[1]  
Abdou O.A., 1996, J ARCHITECTURAL ENG, V2, P3, DOI 10.1061/(ASCE)1076-0431(1996)2:1(3)
[2]   The importance and allocation of risks in Indonesian construction projects [J].
Andi .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2006, 24 (01) :69-80
[3]  
[Anonymous], VICE PRESIDENCY PROJ
[4]  
[Anonymous], 2012, INT J ENG SCI TECHNO
[5]  
[Anonymous], IDENTIFYING MANAGING
[6]  
[Anonymous], IDENTIFYING KEY RISK
[7]  
Barber R. B., 2005, International Journal of Project Management, V23, P584, DOI 10.1016/j.ijproman.2005.05.006
[8]  
Calderón-Segura Y, 2013, INT CONF ELECTR COMM, P67, DOI 10.1109/CONIELECOMP.2013.6525761
[9]  
CHAPMAN R.J., 2001, INT J PROJ MANAG, V19, P147
[10]   Application of a Fuzzy AHP Method to Risk Assessment of International Construction Projects [J].
Chen, Peihong ;
Wang, Jiaqiong .
ECBI: 2009 INTERNATIONAL CONFERENCE ON ELECTRONIC COMMERCE AND BUSINESS INTELLIGENCE, PROCEEDINGS, 2009, :459-+