Impact of costal embankment on the flash flood in Bangladesh: a case study

被引:43
作者
Choudhury, NY
Paul, A
Paul, BK
机构
[1] Kansas State Univ, Dept Geog, Manhattan, KS 66506 USA
[2] Univ Dhaka, Dept Geog & Environm, Dhaka, Bangladesh
[3] Univ Chittagong, Dept Geog, Chittagong, Bangladesh
关键词
coastal embankment; flash flood; reconstruction; Chokoria; Matamuhuri; Bangladesh;
D O I
10.1016/j.apgeog.2004.04.001
中图分类号
P9 [自然地理学]; K9 [地理];
学科分类号
0705 ; 070501 ;
摘要
Coastal areas of Bangladesh frequently experience tropical cyclones and associated tidal bore. In order to prevent cyclonic or storm-surge flooding and to increase crop production by preventing intrusion of saline ocean water, many coastal embankment projects were initiated in the 1960s by the Bangladesh government. After construction of these embankments, particularly their reconstruction in 1991 has increased the frequency of flash floods in coastal areas. The objective of this study is to examine to what extent the reconstruction of embankment is responsible for the increased severity of flash flooding at the Chokoria thana of the Cox's Bazar district, Bangladesh. Using hydrological data and perception of the respondents on the increased flooding through the rapid rural appraisal (RRA) method, it was found that severity of the flood increased after the reconstruction of embankments in 1991. Other causes of increased flooding is also explored. (C) 2004 Elsevier Ltd. All rights reserved.
引用
收藏
页码:241 / 258
页数:18
相关论文
共 15 条
[1]  
Ahmad E, 2001, DISASTER BANGLADESH, P9
[2]  
[Anonymous], 1985, A PRACTICAL APPROACH
[3]  
[Anonymous], IMPACT FLOOD CONTROL
[4]  
*BBS, 1993, BANGL POP CENS 1991
[5]   FLOODS IN BANGLADESH .1. GEOGRAPHICAL BACKGROUND TO THE 1987 AND 1988 FLOODS [J].
BRAMMER, H .
GEOGRAPHICAL JOURNAL, 1990, 156 :12-22
[6]  
*BWDB, 1995, UPD INV COMPL WAT DE
[7]  
Cooke R U, 1990, GEOMORPHOLOGY ENV MA
[8]  
*ENG PLANN CONS LT, 1996, MAT IRR PROJ FIN FEA, V1
[9]  
HAQUE CE, 1997, HAZ FICK ENV BANGL
[10]  
NINNO CD, 2001, 1998 FLOODS BANGL DI