A conceptual framework for developing a BIM-enabled claim management system

被引:19
作者
Shahhosseini, Vahid [1 ]
Hajarolasvadi, Hossein [1 ]
机构
[1] Amirkabir Univ Technol, Dept Civil & Environm Engn, Tehran Polytech, Tehran, Iran
关键词
Claim management; building information model (BIM); contract management; construction claims; construction disputes; contract model; NEURAL-NETWORK; CONSTRUCTION PROJECTS; MODEL; COST; PERCEPTION; TIME;
D O I
10.1080/15623599.2018.1512182
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Claims and disputes frequently occur at the end of construction projects. The process of managing the claims is complex and wastefully consumes project resources like time and money. In recent years, the construction industry has been looking for new methods of claim management that are more productive. In response to this need, different knowledge-based expert systems have been developed. A big challenge that can be attributed to all these systems is how to provide input information. The Building Information Model is a rich description of a project. This feature underpins its use as the input of a claim management expert system. This article explores the feasibility of using BIM to provide input information for claim management expert systems. For the purposes of this study, a framework has been proposed to develop a new BIM-enabled claim management system in order to control contractual rules automatically and consistently during a project. In the end, a simple project is modeled to better represent the feasibility of the idea put forth. We believe that the proposed framework provides a useful tool to handle claims in a more reliable and productive manner.
引用
收藏
页码:208 / 222
页数:15
相关论文
共 57 条
[31]  
Greenwood D., 2010, Construction, Building and Real Estate Research Conference, P363
[32]   Claims management in the Egyptian industrial construction sector: a contractor's perspective [J].
Hassanein, Amr ;
El Nemr, Waleed .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2008, 15 (05) :456-+
[33]  
Hjelt M, 2006, J INF TECHNOL CONSTR, V11, P113
[34]  
Jervis B.M., 1988, Construction Law, Principles and Practice
[35]  
Kauffmann P.P., 2002, ENG MANAG J, V14, P13, DOI [10.1080/10429247.2002.11415144, DOI 10.1080/10429247.2002.11415144]
[36]   Benchmarking claim causes against contractors in emerging markets: empirical case study [J].
Le-Hoai, Long ;
Dang, Chau Ngoc ;
Lee, Su Bhin ;
Lee, Young Dai .
INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, 19 (04) :307-316
[37]   Using BIM to Identify Claims Early in the Construction Industry: Case Study [J].
Marzouk, Mohamed ;
Othman, Ahmed ;
Enaba, Mohamed ;
Zaher, Mohamed .
JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2018, 10 (03)
[38]   Causes of claims in road construction projects in the UAE [J].
Mishmish, Malek ;
El-Sayegh, Sameh M. .
INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2018, 18 (01) :26-33
[39]   An integrated decision support system for dealing with time extension entitlements [J].
Palaneeswaran, Ekambaram ;
Kumaraswamy, Mohan M. .
AUTOMATION IN CONSTRUCTION, 2008, 17 (04) :425-438
[40]   The use of a virtual building design and construction model for developing an effective project concept in 5D environment [J].
Popov, Vladimir ;
Juocevicius, Virgaudas ;
Migilinskas, Darius ;
Ustinovichius, Leonas ;
Mikalauskas, Saulius .
AUTOMATION IN CONSTRUCTION, 2010, 19 (03) :357-367