共 50 条
[43]
A genetic algorithm for solving fuzzy resource-constrained project scheduling
[J].
ADVANCES IN NATURAL COMPUTATION, PT 3, PROCEEDINGS,
2005, 3612
:171-180
[44]
An estimation of distribution algorithm for resource-constrained project scheduling problem
[J].
2010 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-5,
2010,
:265-270
[46]
Heuristic Algorithm in Optimizing Stochastic Resource-Constrained Project Scheduling
[J].
INTERNATIONAL JOINT CONFERENCE ON COMPUTATIONAL SCIENCES AND OPTIMIZATION, VOL 1, PROCEEDINGS,
2009,
:975-+
[47]
Solving Resource-Constrained Project Scheduling Problem by Genetic Algorithm
[J].
2014 2ND INTERNATIONAL CONFERENCE ON BUSINESS AND INFORMATION MANAGEMENT (ICBIM),
2014,
[49]
Optimization of Resource-Constrained Project Using Genetic Algorithm
[J].
PROCEEDINGS OF THE CANADIAN SOCIETY FOR CIVIL ENGINEERING ANNUAL CONFERENCE, VOL 3, CSCE 2023,
2024, 497
:481-492