Model and Algorithm for Human Resource-Constrained R&D Program Scheduling Optimization

被引:3
作者
Chen, Junjie [1 ]
Tong, Shurong [1 ]
Xie, Hongmei [2 ]
Nie, Yafei [1 ]
Zhang, Jingwen [1 ]
机构
[1] Northwestern Polytech Univ, Sch Management, Xian 710072, Shaanxi, Peoples R China
[2] Northwestern Polytech Univ, Sch Elect & Informat, Xian 710072, Shaanxi, Peoples R China
基金
中国国家自然科学基金;
关键词
D O I
10.1155/2019/2320632
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
In resource-constrained project scheduling problems, renewable resources can be expanded into human resources with competency differences. A flexible resource-constrained project scheduling problem with competency differences is proposed, which is a practical extension close to Research and Development (R&D) program management, from the traditional multimode resource-constrained project scheduling problem. A parameter and estimation formula to measure staff competency is presented, and a mixed-integer programming model is established for the problem. The single-objective optimization problems of optimal duration and optimal cost are solved sequentially according to the biobjective importance. To solve the model, according to the assumptions and constraints of the model, the initial network diagram of multiple projects is determined, the enumeration algorithm satisfying constraint conditions provides the feasible solution sets, and the algorithm based on dynamic programming is designed for phased optimization. Experimental results show that the proposed optimization model considering competence differences can solve the problem effectively.
引用
收藏
页数:13
相关论文
共 50 条
[41]   Efficient genetic algorithm for resource-constrained project scheduling problem [J].
Wang H. ;
Li T. ;
Lin D. .
Transactions of Tianjin University, 2010, 16 (5) :376-382
[42]   A branch-and-cut algorithm for a resource-constrained scheduling problem [J].
Sirdey, Renaud ;
Kerivin, Herve L. M. .
RAIRO-OPERATIONS RESEARCH, 2007, 41 (03) :235-251
[43]   A genetic algorithm for solving fuzzy resource-constrained project scheduling [J].
Wang, H ;
Lin, D ;
Li, MQ .
ADVANCES IN NATURAL COMPUTATION, PT 3, PROCEEDINGS, 2005, 3612 :171-180
[44]   An estimation of distribution algorithm for resource-constrained project scheduling problem [J].
Fang, Chen ;
Wang, Ling ;
Xu, Ye .
2010 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-5, 2010, :265-270
[45]   A hybrid genetic algorithm for the resource-constrained project scheduling problem [J].
Valls, Vicente ;
Ballestin, Francisco ;
Quintanilla, Sacramento .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 185 (02) :495-508
[46]   Heuristic Algorithm in Optimizing Stochastic Resource-Constrained Project Scheduling [J].
Guo, Fang Ming ;
Ma, Li ;
He, Min .
INTERNATIONAL JOINT CONFERENCE ON COMPUTATIONAL SCIENCES AND OPTIMIZATION, VOL 1, PROCEEDINGS, 2009, :975-+
[47]   Solving Resource-Constrained Project Scheduling Problem by Genetic Algorithm [J].
Kadam, Sachin U. ;
Kadam, Narendra S. .
2014 2ND INTERNATIONAL CONFERENCE ON BUSINESS AND INFORMATION MANAGEMENT (ICBIM), 2014,
[48]   Ant Colony Optimization for Multimode Resource-Constrained Project Scheduling [J].
Zhang, Hong .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2012, 28 (02) :150-159
[49]   Optimization of Resource-Constrained Project Using Genetic Algorithm [J].
Ahmed, Sweilam ;
Berlant, Arab ;
Omar, Sawan ;
Yasmeen, Essawy ;
Osama, Hosny .
PROCEEDINGS OF THE CANADIAN SOCIETY FOR CIVIL ENGINEERING ANNUAL CONFERENCE, VOL 3, CSCE 2023, 2024, 497 :481-492
[50]   Ant Colony Optimization for Multimode Resource-Constrained Project Scheduling [J].
Menesi, Wail ;
Hegazy, Tarek .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2014, 30 (03)