Model and Algorithm for Human Resource-Constrained R&D Program Scheduling Optimization

被引:3
作者
Chen, Junjie [1 ]
Tong, Shurong [1 ]
Xie, Hongmei [2 ]
Nie, Yafei [1 ]
Zhang, Jingwen [1 ]
机构
[1] Northwestern Polytech Univ, Sch Management, Xian 710072, Shaanxi, Peoples R China
[2] Northwestern Polytech Univ, Sch Elect & Informat, Xian 710072, Shaanxi, Peoples R China
基金
中国国家自然科学基金;
关键词
D O I
10.1155/2019/2320632
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
In resource-constrained project scheduling problems, renewable resources can be expanded into human resources with competency differences. A flexible resource-constrained project scheduling problem with competency differences is proposed, which is a practical extension close to Research and Development (R&D) program management, from the traditional multimode resource-constrained project scheduling problem. A parameter and estimation formula to measure staff competency is presented, and a mixed-integer programming model is established for the problem. The single-objective optimization problems of optimal duration and optimal cost are solved sequentially according to the biobjective importance. To solve the model, according to the assumptions and constraints of the model, the initial network diagram of multiple projects is determined, the enumeration algorithm satisfying constraint conditions provides the feasible solution sets, and the algorithm based on dynamic programming is designed for phased optimization. Experimental results show that the proposed optimization model considering competence differences can solve the problem effectively.
引用
收藏
页数:13
相关论文
共 50 条
[31]   Improved ACO Algorithm for Resource-Constrained Project Scheduling Problem [J].
Zhou, Yumiao ;
Guo, Qingshun ;
Gan, Rongwei .
2009 INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND COMPUTATIONAL INTELLIGENCE, VOL III, PROCEEDINGS, 2009, :358-365
[32]   A competitive Genetic Algorithm for resource-constrained project scheduling problem [J].
Wang, H ;
Lin, D ;
Li, MQ .
Proceedings of 2005 International Conference on Machine Learning and Cybernetics, Vols 1-9, 2005, :2945-2949
[33]   A genetic algorithm for solving resource-constrained project scheduling problem [J].
Wang, H ;
Lin, D ;
Li, MQ .
ADVANCES IN NATURAL COMPUTATION, PT 3, PROCEEDINGS, 2005, 3612 :185-193
[34]   A branch and bound algorithm for the resource-constrained project scheduling problem [J].
Brucker, P ;
Knust, S ;
Schoo, A ;
Thiele, O .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 107 (02) :272-288
[35]   Efficient Genetic Algorithm for Resource-Constrained Project Scheduling Problem [J].
王宏 ;
李同玲 ;
林丹 .
Transactions of Tianjin University, 2010, (05) :376-382
[36]   Improved genetic algorithm for resource-constrained scheduling of large projects [J].
Kim, Jin-Lee .
CANADIAN JOURNAL OF CIVIL ENGINEERING, 2009, 36 (06) :1016-1027
[37]   Demonstrating Johnson's algorithm via resource-constrained scheduling [J].
Cheng, T. C. E. ;
Lin, B. M. T. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (11) :3326-3330
[38]   Efficient Genetic Algorithm for Resource-Constrained Project Scheduling Problem [J].
王宏 ;
李同玲 ;
林丹 .
Transactions of Tianjin University, 2010, 16 (05) :376-382
[39]   An improved PSO algorithm for resource-constrained project scheduling problem [J].
Luo, Xinggang ;
Wang, Dingwei ;
Tang, Jianfu ;
Tu, Yiliu .
WCICA 2006: SIXTH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-12, CONFERENCE PROCEEDINGS, 2006, :3514-+
[40]   Heuristic algorithm for flexible resource-constrained project scheduling problem [J].
Jia, Yan ;
Wang, Zhimin ;
Zhang, Yuegang .
Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2015, 21 (07) :1846-1855