Model and Algorithm for Human Resource-Constrained R&D Program Scheduling Optimization

被引:3
作者
Chen, Junjie [1 ]
Tong, Shurong [1 ]
Xie, Hongmei [2 ]
Nie, Yafei [1 ]
Zhang, Jingwen [1 ]
机构
[1] Northwestern Polytech Univ, Sch Management, Xian 710072, Shaanxi, Peoples R China
[2] Northwestern Polytech Univ, Sch Elect & Informat, Xian 710072, Shaanxi, Peoples R China
基金
中国国家自然科学基金;
关键词
D O I
10.1155/2019/2320632
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
In resource-constrained project scheduling problems, renewable resources can be expanded into human resources with competency differences. A flexible resource-constrained project scheduling problem with competency differences is proposed, which is a practical extension close to Research and Development (R&D) program management, from the traditional multimode resource-constrained project scheduling problem. A parameter and estimation formula to measure staff competency is presented, and a mixed-integer programming model is established for the problem. The single-objective optimization problems of optimal duration and optimal cost are solved sequentially according to the biobjective importance. To solve the model, according to the assumptions and constraints of the model, the initial network diagram of multiple projects is determined, the enumeration algorithm satisfying constraint conditions provides the feasible solution sets, and the algorithm based on dynamic programming is designed for phased optimization. Experimental results show that the proposed optimization model considering competence differences can solve the problem effectively.
引用
收藏
页数:13
相关论文
共 50 条
[21]   Scheduling of resource-constrained projects [J].
Zilinskas, A .
INTERFACES, 2001, 31 (04) :133-135
[22]   RESOURCE-CONSTRAINED ASSIGNMENT SCHEDULING [J].
MAZZOLA, JB ;
NEEBE, AW .
OPERATIONS RESEARCH, 1986, 34 (04) :560-572
[23]   HEURISTICS FOR RESOURCE-CONSTRAINED SCHEDULING [J].
ELSAYED, EA ;
NASR, NZ .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1986, 24 (02) :299-310
[24]   Scheduling of resource-constrained projects [J].
Wilson, J .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2001, 52 (07) :846-846
[25]   Fuzzy optimal model for resource-constrained construction scheduling [J].
Leu, SS ;
Chen, AT ;
Yang, CH .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 1999, 13 (03) :207-216
[26]   An efficient simulation algorithm for Resource-Constrained Project Scheduling Problem [J].
Peng, L. ;
Wuliang, P. .
Open Mechanical Engineering Journal, 2014, 8 (01) :9-13
[27]   A Local Search Algorithm for the Resource-Constrained Project Scheduling Problem [J].
Goncharov E.N. .
Journal of Applied and Industrial Mathematics, 2022, 16 (04) :672-683
[28]   A hybrid evolutionary algorithm for the resource-constrained project scheduling problem [J].
Thammano A. ;
Phu-ang A. .
Artificial Life and Robotics, 2012, 17 (02) :312-316
[29]   An Orthogonal hybrid algorithm for the resource-constrained project scheduling problem [J].
Huang, Zhiyu .
2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, :8292-8297
[30]   Best Insertion Algorithm for Resource-constrained Project Scheduling Problem [J].
Pesek, Igor ;
Zerovnik, Janez .
KOI 2006: 11TH INTERNATIONAL CONFERENCE ON OPERATIONAL RESEARCH, PROCEEDINGS, 2008, :169-176