Model and Algorithm for Human Resource-Constrained R&D Program Scheduling Optimization

被引:3
作者
Chen, Junjie [1 ]
Tong, Shurong [1 ]
Xie, Hongmei [2 ]
Nie, Yafei [1 ]
Zhang, Jingwen [1 ]
机构
[1] Northwestern Polytech Univ, Sch Management, Xian 710072, Shaanxi, Peoples R China
[2] Northwestern Polytech Univ, Sch Elect & Informat, Xian 710072, Shaanxi, Peoples R China
基金
中国国家自然科学基金;
关键词
D O I
10.1155/2019/2320632
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
In resource-constrained project scheduling problems, renewable resources can be expanded into human resources with competency differences. A flexible resource-constrained project scheduling problem with competency differences is proposed, which is a practical extension close to Research and Development (R&D) program management, from the traditional multimode resource-constrained project scheduling problem. A parameter and estimation formula to measure staff competency is presented, and a mixed-integer programming model is established for the problem. The single-objective optimization problems of optimal duration and optimal cost are solved sequentially according to the biobjective importance. To solve the model, according to the assumptions and constraints of the model, the initial network diagram of multiple projects is determined, the enumeration algorithm satisfying constraint conditions provides the feasible solution sets, and the algorithm based on dynamic programming is designed for phased optimization. Experimental results show that the proposed optimization model considering competence differences can solve the problem effectively.
引用
收藏
页数:13
相关论文
共 50 条
[1]   Consolidated optimization algorithm for resource-constrained project scheduling problems [J].
Elsayed, Saber ;
Sarker, Ruhul ;
Ray, Tapabrata ;
Coello Coello, Carlos .
INFORMATION SCIENCES, 2017, 418 :346-362
[2]   An Efficient Optimization Algorithm for Resource-Constrained Steelmaking Scheduling Problems [J].
Li, Junqing ;
Duan, Peiyong ;
Sang, Hongyan ;
Wang, Song ;
Liu, Zhengmin ;
Duan, Peng .
IEEE ACCESS, 2018, 6 :33883-33894
[3]   Decision-making method for resource-constrained R&D [J].
Wang, Tao .
Huazhong Ligong Daxue Xuebao/Journal Huazhong (Central China) University of Science and Technology, 2000, 28 (05) :72-74
[4]   An evolutionary algorithm for resource-constrained project scheduling [J].
Hindi, KS ;
Yang, HB ;
Fleszar, K .
IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (05) :512-518
[5]   A competitive genetic algorithm for resource-constrained project scheduling [J].
Hartmann, S .
NAVAL RESEARCH LOGISTICS, 1998, 45 (07) :733-750
[6]   Genetic algorithm for the resource-constrained project scheduling problem [J].
E. N. Goncharov ;
V. V. Leonov .
Automation and Remote Control, 2017, 78 :1101-1114
[7]   An efficient hybrid algorithm for resource-constrained project scheduling [J].
Chen, Wang ;
Shi, Yan-jun ;
Teng, Hong-fei ;
Lan, Xiao-ping ;
Hu, Li-chen .
INFORMATION SCIENCES, 2010, 180 (06) :1031-1039
[8]   Memetic algorithm for the resource-constrained project scheduling problem [J].
Chen, Di ;
Liu, Shixin ;
Qin, Shujin .
2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2014, :4991-4996
[9]   A Flexible Heuristic Algorithm for Resource-Constrained Project Scheduling [J].
Seda, Milos ;
Matousek, Radomil ;
Osmera, Pavel ;
Pivonka, Petr ;
Sandera, Cenek .
WCECS 2009: WORLD CONGRESS ON ENGINEERING AND COMPUTER SCIENCE, VOLS I AND II, 2009, :730-+
[10]   Population learning algorithm for resource-constrained project scheduling [J].
Jedrzejowicz, P ;
Ratajczak, E .
ARTIFICIAL NEURAL NETS AND GENETIC ALGORITHMS, PROCEEDINGS, 2003, :223-228