Scheduling of two-machine robotic rework cells: In-process, post-process and in-line inspection scenarios

被引:20
作者
Foumani, Mehdi [1 ,2 ]
Smith-Miles, Kate [1 ]
Gunawan, Indra [3 ]
机构
[1] Monash Univ, Sch Math Sci, Clayton, Vic 3800, Australia
[2] Monash Univ, Dept Econometr & Business Stat, Caulfield, Vic 3145, Australia
[3] Univ Adelaide, Entrepreneurship Commercialisat & Innovat Ctr, Adelaide, SA 5005, Australia
关键词
Scheduling; Cyclic production; Robotic cell; Manufacturing; Inspection; TOOLS; MODEL; ARM;
D O I
10.1016/j.robot.2017.01.009
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This study focuses on the domain of a two-machine robotic cell scheduling problem under three inspection scenarios. We propose the first analytical method for minimizing the partial cycle time of cells with in-process and post-process inspection scenarios, and then we convert this cell into a multi-function robotic cell with in-line inspection scenario. For the first scenario, parts are inspected in one of the production machines using multiple sensors, while the inspection process is performed by an independent inspection machine for the second scenario. Alternatively, the inspection can be performed by a multi-function robot for the third scenario. A distinguishing characteristic of this robot is that it can perform inspection of the part in transit. However, the robot cannot complete the part transition and load it on the next destination machine if it identifies a fault in the part. The stochastic nature of the process prevents us from applying existing deterministic solution methods for corresponding scheduling problems. In the first stage, we present a heuristic method that converts a multiple-sensor inspection system into a single-sensor inspection system. The expected cycle times of two different cycles are derived based on a geometric distribution, and then the maximum expected throughput is pursued for in-process and post-process inspection sensors, respectively. In the second stage, we develop the inspection system into an in-line inspection system using a multi-function robot. Finally, we determine if it is technically feasible and profitable to replace the in-process (or post-process) inspection scenario with the in-line inspection scenario. (C) 2017 Elsevier B.V. All rights reserved.
引用
收藏
页码:210 / 225
页数:16
相关论文
共 37 条
[31]   Towards industrial internet of things: Crankshaft monitoring, traceability and tracking using RFID [J].
Velandia, Diana M. Segura ;
Kaur, Navjot ;
Whittow, William G. ;
Conway, Paul P. ;
West, Andrew A. .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2016, 41 :66-77
[32]   A graph-theoretic, linear-time scheme to detect and resolve deadlocks in flexible manufacturing cells [J].
Venkatesh, S ;
Smith, JS .
JOURNAL OF MANUFACTURING SYSTEMS, 2003, 22 (03) :220-238
[33]   A clustering approach for minimizing intercell trips in cell formation [J].
Wei, Nai-Chieh ;
Mejabi, Olugbenga O. .
JOURNAL OF INTELLIGENT MANUFACTURING, 2008, 19 (01) :13-20
[34]   Optimal One-Wafer Cyclic Scheduling of Single-Arm Multicluster Tools With Two-Space Buffering Modules [J].
Yang, FaJun ;
Wu, NaiQi ;
Qiao, Yan ;
Zhou, MengChu .
IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2014, 44 (12) :1584-1597
[35]   Two-machine robotic cell scheduling problem with sequence-dependent setup times [J].
Zarandi, M. H. Fazel ;
Mosadegh, H. ;
Fattahi, M. .
COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (05) :1420-1434
[36]   Sensitivity-analysis based method in single-robot cells cost-effective design and optimization [J].
Zhang, Jiafan ;
Fang, Xinyu ;
Qi, Liwei .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2016, 38 :9-15
[37]   Optimal cyclic single crane scheduling for two parallel train oilcan repairing lines [J].
Zhou, Zhili ;
Li, Ling .
COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (08) :1850-1856