On the pointlessness of machine learning based time delayed prediction of TBM operational data

被引:38
作者
Erharter, Georg H. [1 ]
Marcher, Thomas [1 ]
机构
[1] Graz Univ Technol, Inst Rock Mech & Tunnelling, Rechbauerstr 12, Graz, Austria
关键词
Rockmass prediction; TBM operational data; Plausibility; Reproducibility; Time delayed prediction; RECURRENT NEURAL-NETWORK; LSTM; MODEL;
D O I
10.1016/j.autcon.2020.103443
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In tunneling, predictions of the rockmass conditions ahead of the face are of great interest to be able to take appropriate countermeasures at the right time. Besides investigations like drilling or geophysics, new approaches in mechanized tunneling aim at forecasting the geology ahead via Machine Learning models. These models are trained to forecast tunnel boring machine data by learning from recorded data in already excavated parts of the tunnel. Simply judging from high accuracies, these results may look promising at the first sight, but forecasts like this are mostly just delayed and slightly altered versions of the input data and no predictive value can result from them. This paper shows deficits in the current practice of data driven forecasts ahead of the tunnel face and raises impetus for further research in this particular field and TBM data analysis in general.
引用
收藏
页数:12
相关论文
共 52 条
[1]  
Abadi Martin, 2016, Proceedings of OSDI '16: 12th USENIX Symposium on Operating Systems Design and Implementation. OSDI '16, P265
[2]  
[Anonymous], 2020, TAG
[3]   The use of TBM process data as a normative basis of the contractual advance classification for TBM advances in hard rock [J].
Bach D. ;
Holzer W. ;
Leitner W. ;
Radončić N. .
Geomechanik und Tunnelbau, 2018, 11 (05) :505-518
[4]  
Barton N., 1974, ROCK MECH FELSMECHAN, V6, P189, DOI [10.1007/BF01239496, DOI 10.1007/BF01239496, 10.1007/bf01239496]
[5]   Learning and optimization from the exploratory tunnel – Brenner Base Tunnel; [Lernen und Optimieren vom Erkundungsstollen – Brenner Basistunnel] [J].
Bergmeister K. ;
Reinhold C. .
Geomechanik und Tunnelbau, 2017, 10 (05) :467-476
[6]   Random forests [J].
Breiman, L .
MACHINE LEARNING, 2001, 45 (01) :5-32
[7]   Random forests [J].
Breiman, L .
MACHINE LEARNING, 2001, 45 (01) :5-32
[8]   NEURAL-NETWORK PREDICTION OF SOLAR-ACTIVITY [J].
CALVO, RA ;
CECCATTO, HA ;
PIACENTINI, RD .
ASTROPHYSICAL JOURNAL, 1995, 444 (02) :916-921
[9]   Modification of the random forest algorithm to avoid statistical dependence problems when classifying remote sensing imagery [J].
Canovas-Garcia, Fulgencio ;
Alonso-Sarria, Francisco ;
Gomariz-Castillo, Francisco ;
Onate-Valdivieso, Fernando .
COMPUTERS & GEOSCIENCES, 2017, 103 :1-11
[10]   A two-step-ahead recurrent neural network for stream-flow forecasting [J].
Chang, LC ;
Chang, FJ ;
Chiang, YM .
HYDROLOGICAL PROCESSES, 2004, 18 (01) :81-92