A bivariate replacement policy for an imperfect repair system based on geometric processes

被引:6
作者
Dong, Qinglai [1 ,2 ]
Cui, Lirong [1 ]
Gao, Hongda [1 ]
机构
[1] Beijing Inst Technol, Sch Management & Econ, Beijing 100081, Peoples R China
[2] Yanan Univ, Sch Math & Comp Sci, Yanan, Peoples R China
基金
中国国家自然科学基金;
关键词
Maintenance; replacement policy; delayed repair; geometric process; working time threshold; working age threshold; MAINTENANCE POLICIES; MODEL; RELIABILITY;
D O I
10.1177/1748006X18817359
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A repair replacement model for a deteriorating system with delayed repair is studied, in which the successive working times after repair and the consecutive repair times of the system are described by geometric processes. The instantaneous availability is studied in the case of general distributions for the working time, repair time and delayed repair time. A bivariate replacement policy is considered, that is, the system is replaced whenever the working age of the system reaches T or at the first hitting time of the working time after repair with respect to the working time threshold tau, whichever occurs first. The explicit expression of the long-run average cost rate under the replacement policies is derived. The corresponding optimal replacement policy can be determined numerically, and numerical examples are presented to demonstrate the application of the developed model and approach. It is shown that the optimal solution and optimal value are sensitive to the tiny change in the ratios of the Geometric processes and the expectation of the delayed repair time.
引用
收藏
页码:670 / 681
页数:12
相关论文
共 33 条
[1]   OPTIMUM PREVENTIVE MAINTENANCE POLICIES [J].
BARLOW, R ;
HUNTER, L .
OPERATIONS RESEARCH, 1960, 8 (01) :90-100
[2]   Reward optimization of a repairable system [J].
Castro, IT ;
Pérez-Ocón, R .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2006, 91 (03) :311-319
[3]   Optimal replacement model with age-dependent failure type based on a cumulative repair-cost limit policy [J].
Chang, Chin-Chih ;
Sheu, Shey-Huei ;
Chen, Yen-Luan .
APPLIED MATHEMATICAL MODELLING, 2013, 37 (1-2) :308-317
[4]   A geometric process repair model with inspections and its optimisation [J].
Cheng, G. Q. ;
Li, L. .
INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2012, 43 (09) :1650-1655
[5]  
[程晓绚 Cheng Xiaoxuan], 2017, [运筹学学报, Operations Research Transaction], V21, P78
[6]  
Cui L, 2008, HDB PERFORMABILITY E, P789, DOI DOI 10.1007/978-1-84800-131-2_48
[7]   Some reliability indexes and sojourn time distributions for a repairable degradation model [J].
Du, Shijia ;
Cui, Lirong ;
Lin, Cong .
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY, 2016, 230 (03) :334-349
[8]   OBSERVING STOCHASTIC PROCESSES AND APPROXIMATE TRANSFORM INVERSION [J].
GAVER, DP .
OPERATIONS RESEARCH, 1966, 14 (03) :444-&
[9]   Preventive maintenance of a single machine system working under piecewise constant operating condition [J].
Hu, Jiawen ;
Jiang, Zuhua ;
Liao, Haitao .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2017, 168 :105-115
[10]   A NOTE ON THE OPTIMAL REPLACEMENT-PROBLEM [J].
LAM, Y .
ADVANCES IN APPLIED PROBABILITY, 1988, 20 (02) :479-482