Collaborative Scheduling of On-Site and Off-Site Operations in Prefabrication

被引:23
|
作者
Chen, Wei [1 ]
Zhao, Ying [1 ]
Yu, Yangqing [1 ]
Chen, Kaiman [2 ]
Arashpour, Mehrdad [3 ]
机构
[1] Wuhan Univ Technol, Dept Civil Engn & Architecture, Wuhan 430070, Hubei, Peoples R China
[2] Univ Toronto, Dept Art & Sci, Toronto, ON M5S 1A1, Canada
[3] Monash Univ, Dept Civil Engn, Melbourne, Vic 3800, Australia
关键词
collaborative scheduling; on-site; off-site; prefabricated construction; schedule optimization; simulated annealing algorithm; CONSTRUCTION; METHODOLOGY; MANAGEMENT; RESOURCES; RISKS;
D O I
10.3390/su12219266
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
As a kind of sustainable technology, prefabricated construction has increasingly gained momentum internationally due to its numerous benefits that include, but are not limited to, safe construction, waste minimization, quality improvement, and productivity enhancement. However, productivity in this domain is reliant on the efficiency of both on-site and off-site operations. On this basis, focusing on collaborative scheduling mechanisms, the current paper develops a static scheduling model and a dynamic scheduling model in prefabricated construction, and uses a simulated annealing algorithm (SA) to settle the optimization of operation planning considering delays by risks. The developed models are validated using data from a construction project with multiple suppliers of prefabricated elements. This study contributes to the body of knowledge in prefabricated construction management by streamlining collaborative scheduling in prefabrication. The established models provide construction managers with decision support systems with the aims of minimizing delays and related cost overruns.
引用
收藏
页码:1 / 23
页数:21
相关论文
共 50 条
  • [21] Optimization modeling modeling of multi-skilled resources in prefabrication: Theorizing cost analysis of process integration in off-site construction
    Arashpour, Mehrdad
    Kamat, Vineet
    Bai, Yu
    Wakefield, Ron
    Abbasi, Babak
    AUTOMATION IN CONSTRUCTION, 2018, 95 : 1 - 9
  • [22] Production scheduling of off-site prefabricated construction components considering sequence dependent due dates
    Yazdani, Maziar
    Kabirifar, Kamyar
    Fathollahi-Fard, Amir M.
    Mojtahedi, Mohammad
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2021,
  • [23] Factors influencing the selection of a procurement route for UK off-site housebuilding
    Agapiou, Andrew
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MANAGEMENT PROCUREMENT AND LAW, 2022, 175 (01) : 3 - 15
  • [24] Influence diagrams for off-site construction manufacturing risk assessment in China
    Zhang, Lin
    Agapiou, Andrew
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MANAGEMENT PROCUREMENT AND LAW, 2021, 174 (04) : 145 - 162
  • [25] Capturing Joint Angles of the Off-site Human Body
    Garimella, Raman
    Peeters, Thomas
    Beyers, Koen
    Truijen, Steven
    Huysmans, Toon
    Verwulgen, Stijn
    2018 IEEE SENSORS, 2018, : 1244 - 1247
  • [26] Workers' safety behaviors in the off-site manufacturing plant
    Liu, Qinjun
    Ye, Gui
    Feng, Yingbin
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (03) : 765 - 784
  • [27] Examining Off-Site Construction from a Flow Viewpoint
    da Rocha, Cecilia Gravina
    Wijayaratna, Kasun
    Jong, Kase
    Haller, David
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2023, 149 (03)
  • [28] Sustainability perceptions of off-site manufacturing stakeholders in Australia
    Hu, Xin
    Chong, Heap-Yih
    Wang, Xiangyu
    JOURNAL OF CLEANER PRODUCTION, 2019, 227 : 346 - 354
  • [29] Off-site movement of quinclorac from rice fields
    Vidotto, Francesco
    Fogliatto, Silvia
    Carmagnola, Lorenzo
    De Palo, Fernando
    Milan, Marco
    ITALIAN JOURNAL OF AGRONOMY, 2021, 16 (03)
  • [30] Pediatricians' Perceptions of an Off-Site Collaboration With Child Psychiatry
    Sheldrick, R. Christopher
    Mattern, Kathryn
    Perrin, Ellen C.
    CLINICAL PEDIATRICS, 2012, 51 (06) : 546 - 550