Collaborative Scheduling of On-Site and Off-Site Operations in Prefabrication

被引:23
|
作者
Chen, Wei [1 ]
Zhao, Ying [1 ]
Yu, Yangqing [1 ]
Chen, Kaiman [2 ]
Arashpour, Mehrdad [3 ]
机构
[1] Wuhan Univ Technol, Dept Civil Engn & Architecture, Wuhan 430070, Hubei, Peoples R China
[2] Univ Toronto, Dept Art & Sci, Toronto, ON M5S 1A1, Canada
[3] Monash Univ, Dept Civil Engn, Melbourne, Vic 3800, Australia
关键词
collaborative scheduling; on-site; off-site; prefabricated construction; schedule optimization; simulated annealing algorithm; CONSTRUCTION; METHODOLOGY; MANAGEMENT; RESOURCES; RISKS;
D O I
10.3390/su12219266
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
As a kind of sustainable technology, prefabricated construction has increasingly gained momentum internationally due to its numerous benefits that include, but are not limited to, safe construction, waste minimization, quality improvement, and productivity enhancement. However, productivity in this domain is reliant on the efficiency of both on-site and off-site operations. On this basis, focusing on collaborative scheduling mechanisms, the current paper develops a static scheduling model and a dynamic scheduling model in prefabricated construction, and uses a simulated annealing algorithm (SA) to settle the optimization of operation planning considering delays by risks. The developed models are validated using data from a construction project with multiple suppliers of prefabricated elements. This study contributes to the body of knowledge in prefabricated construction management by streamlining collaborative scheduling in prefabrication. The established models provide construction managers with decision support systems with the aims of minimizing delays and related cost overruns.
引用
收藏
页码:1 / 23
页数:21
相关论文
共 50 条
  • [1] On-site or off-site treatment of medical waste: a challenge
    Taghipour, Hassan
    Mohammadyarei, Taher
    Jafarabadi, Mohamad Asghari
    Hashemi, Ahmad Asl
    JOURNAL OF ENVIRONMENTAL HEALTH SCIENCE AND ENGINEERING, 2014, 12
  • [2] On-site or off-site treatment of medical waste: a challenge
    Hassan Taghipour
    Taher Mohammadyarei
    Mohamad Asghari Jafarabadi
    Ahmad Asl Hashemi
    Journal of Environmental Health Science and Engineering, 12
  • [3] Cost-Effectiveness of On-Site Versus Off-Site Collaborative Care for Depression in Rural FQHCs
    Pyne, Jeffrey M.
    Fortney, John C.
    Mouden, Sip
    Lu, Liya
    Hudson, Teresa J.
    Mittal, Dinesh
    PSYCHIATRIC SERVICES, 2015, 66 (05) : 491 - 499
  • [4] Clinical Outcomes of On-Site Versus Off-Site Endovascular Stroke Interventions
    Alkhouli, Mohamad
    Alqahtani, Fahad
    Hopkins, L. Nelson
    Harris, Alyssa H.
    Hohmann, Samuel F.
    Tarabishy, Abdul
    Holmes, David R.
    JACC-CARDIOVASCULAR INTERVENTIONS, 2020, 13 (18) : 2159 - 2166
  • [5] Obstacles Preventing the Off-Site Prefabrication of Timber and MEP Services: Qualitative Analyses from Builders and Suppliers in Australia
    Lopez, Robert
    Chong, Heap-Yih
    Pereira, Conrad
    BUILDINGS, 2022, 12 (07)
  • [6] A sedimentological connectivity approach for assessing on-site and off-site soil erosion control services
    Liu, Yu
    Zhao, Liang
    Yu, Xiubo
    ECOLOGICAL INDICATORS, 2020, 115
  • [7] Comparing on-site and off-site survey data to investigate survey biases in recreational fisheries data
    Lewin, Wolf-Christian
    Weltersbach, Marc Simon
    Haase, Kevin
    Riepe, Carsten
    Skov, Christian
    Gundelund, Casper
    Strehlow, Harry, V
    ICES JOURNAL OF MARINE SCIENCE, 2021, 78 (07) : 2528 - 2546
  • [8] System based greenhouse emission analysis of off-site prefabrication: a comparative study of residential projects
    Guo, Yuliang
    Shi, Enhui
    Yan, Rui
    Wei, Wenchao
    SCIENTIFIC REPORTS, 2023, 13 (01)
  • [9] Critical evaluation of off-site construction research: A Scientometric analysis
    Hosseini, M. Reza
    Martek, Igor
    Zavadskas, Edmundas Kazimieras
    Aibinu, Ajibade A.
    Arashpour, Mehrdad
    Chileshe, Nicholas
    AUTOMATION IN CONSTRUCTION, 2018, 87 : 235 - 247
  • [10] SWP-enabled constraints modeling for on-site assembly process of prefabrication housing production
    Li, Xiao
    Wu, Chengke
    Wu, Peng
    Xiang, Liqun
    Shen, Geoffrey Qiping
    Vick, Steven
    Li, Clyde Zhengdao
    JOURNAL OF CLEANER PRODUCTION, 2019, 239