Flow shop scheduling problems with transportation and capacities constraints

被引:0
|
作者
Oulamara, A [1 ]
Soukhal, A [1 ]
机构
[1] IMAG, Lab Rech Operat Leibniz, F-38000 Grenoble, France
来源
2001 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-5: E-SYSTEMS AND E-MAN FOR CYBERNETICS IN CYBERSPACE | 2002年
关键词
flow shop; flexible manufacturing cell; complexity results; scheduling; blocking;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In most manufacturing and distribution systems, semi-finished jobs are transferred from one processing facillity to another and finished jobs are delivered to customers or warehouse by vehicles such as trucks. This paper investigates flow shop scheduling problems that explicitly consider constraints on both transportation and buffer capacities. These elements enable the Flexible Manufacturing Systems (FMS) to process different types of parts. The finished jobs leave the processing facility to be delivered to customers or sent to warehouses by vehicles such as trucks. The objective function that is considered is makespan C-max. We prove that this problem is strongly NP-hard when the capacity of truck is equal to two with unlimited buffer behind each machine. This problem with additional constraints, such as blocking; is also proved to be NP-hard.
引用
收藏
页码:2540 / 2545
页数:6
相关论文
共 50 条
  • [1] Flow Shop Scheduling Problems with Transportation Constraints Revisited
    Yuan, Yuan
    Han, Xin
    Lan, Yan
    COMPUTING AND COMBINATORICS, COCOON 2022, 2022, 13595 : 12 - 23
  • [2] Flow shop scheduling problems with transportation constraints revisited
    Lan, Yan
    Yuan, Yuan
    Wang, Yinling
    Han, Xin
    Zhou, Yong
    THEORETICAL COMPUTER SCIENCE, 2024, 985
  • [3] Complexity of flow shop scheduling problems with transportation constraints
    Soukhal, A
    Oulamara, A
    Martineau, P
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 161 (01) : 32 - 41
  • [4] A note on the complexity of flow shop scheduling with transportation constraints
    Yuan, Jinjiang
    Soukhal, Ameur
    Chen, Youjun
    Lu, Lingfa
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 178 (03) : 918 - 925
  • [5] Flow shop scheduling by transportation model
    Onwubolu, GC
    PRODUCTION PLANNING & CONTROL, 1999, 10 (01) : 29 - 34
  • [6] Flow Shop Scheduling Problems Under Machine–Dependent Precedence Constraints
    A.A. Gladky
    Y.M. Shafransky
    V.A. Strusevich
    Journal of Combinatorial Optimization, 2004, 8 : 13 - 28
  • [7] Complexity results for flow-shop and open-shop scheduling problems with transportation delays
    Brucker, P
    Knust, S
    Cheng, TCE
    Shakhlevich, NV
    ANNALS OF OPERATIONS RESEARCH, 2004, 129 (1-4) : 81 - 106
  • [8] Complexity Results for Flow-Shop and Open-Shop Scheduling Problems with Transportation Delays
    Peter Brucker
    Sigrid Knust
    T.C. Edwin Cheng
    Natalia V. Shakhlevich
    Annals of Operations Research, 2004, 129 : 81 - 106
  • [9] Approximation results for flow shop scheduling problems with machine availability constraints
    Kubzin, Mikhail A.
    Potts, Chris N.
    Strusevich, Vitaly A.
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (02) : 379 - 390
  • [10] A Hybrid Metaheuristic Algorithm for Flexible Job-Shop Scheduling Problems with Transportation Constraints
    Zhang, Qiao
    Manier, Herve
    Manier, Marie-Ange
    PROCEEDINGS OF THE FOURTEENTH INTERNATIONAL CONFERENCE ON GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE, 2012, : 441 - 448