Maintenance intervention optimisation for existing railway bridges

被引:0
作者
Nielsen, D. [1 ]
McSweeney, T. [1 ]
Raman, D. [1 ]
机构
[1] CQUniv Australia, Rockhampton, Qld, Australia
来源
BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE EXTENSION | 2014年
关键词
Life cycle costing; Bridges; Railway; Maintenance; Optimisation; Maintenance strategies; LIFETIME FUNCTIONS; EMPHASIS; COST;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Maintenance of aging infrastructure is a burden on many organisational budgets, and Life Cycle Cost Analysis (LCCA) is accepted as an effective method to reduce these costs. However, LCCA becomes extremely complex when applied at the individual bridge component level within a large bridge population while considering multiple maintenance strategies, varying deterioration rates and intervention intervals. To address this concern, a decision support model is presented that proposes maintenance actions for future interventions based on a selection of maintenance strategies and given organisational budget constraints. The remaining service life of surrounding components is considered when assessing the most appropriate maintenance actions. Three popular bridge management strategies are considered in this model, comprising refurbishment, upgrade and renewal strategies. The infrastructure manager may apply one of these three strategies at the bridge level to estimate future network budgets or align with existing budgets. The developed decision support application allows "what-if' scenarios to be generated to determine life cycle costs by changing life gained from maintenance actions, maintenance costs, maintenance strategy, discount rate, intervention trigger time and minimum intervention intervals.
引用
收藏
页码:2733 / 2740
页数:8
相关论文
共 50 条
  • [21] Optimal Scheduling of Track Maintenance on a Railway Network
    Zhang, Tao
    Andrews, John
    Wang, Rui
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2013, 29 (02) : 285 - 297
  • [22] Process Analysis of Human Failures in Railway Maintenance
    Holmgren M.
    Söderholm P.
    Holmgren, Mattias (mattias.holmgren@ltu.se), 1600, Pleiades journals : 381 - 393
  • [23] Multi skilled maintenance of a high speed railway
    de Gijt, Michiel
    Ottjes, Jaap
    Hagestein, Jaap
    Lodewijks, Gabriel
    4TH INTERNATIONAL INDUSTRIAL SIMULATION CONFERENCE 2006, 2006, : 399 - 405
  • [24] Life cycle cost optimisation in highway concrete bridges management
    Almeida, Joana O.
    Teixeira, Paulo F.
    Delgado, Raimundo M.
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2015, 11 (10) : 1263 - 1276
  • [25] Effective construction of railway underpass bridges on steel pipe piles
    Hartikainen, J
    Koskinen, M
    Suomalainen, J
    GEOTECHNICAL ENGINEERING FOR TRANSPORTATION INFRASTRUCTURE, VOLS 1-3: THEORY AND PRACTICE, PLANNING AND DESIGN, CONSTRUCTION AND MAINTENANCE, 1999, : 141 - 146
  • [26] Interaction of buckling modes in railway plate girder steel bridges
    Ellobody, Ehab
    THIN-WALLED STRUCTURES, 2017, 115 : 58 - 75
  • [27] The Design of a Web Service of Railway Bridges Information Based on GIS
    Zhan Qian
    Wei Xianglong
    2009 INTERNATIONAL FORUM ON INFORMATION TECHNOLOGY AND APPLICATIONS, VOL 3, PROCEEDINGS, 2009, : 647 - +
  • [28] Shear strengthening of existing concrete bridges
    Valerio, P
    Ibell, TJ
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-STRUCTURES AND BUILDINGS, 2003, 156 (01) : 75 - 84
  • [29] Rating and Reliability of Existing Bridges in a Network
    Akguel, Ferhat
    Frangopol, Dan M.
    JOURNAL OF BRIDGE ENGINEERING, 2003, 8 (06) : 383 - 393
  • [30] WIDENING OF EXISTING ARCH BRIDGES.
    Venkatesulu, G.
    Kumar, Prafulla
    Sharma, R.S.
    Indian Concrete Journal, 1980, 54 (08): : 215 - 218