An Optimization Algorithm of PCB Assembly Time for Multi-head Placement Machine
被引:0
作者:
Liu, Haiming
论文数: 0引用数: 0
h-index: 0
机构:
South China Univ Technol, Sch Automat Sci & Engn, Guangzhou 510640, Guangdong, Peoples R ChinaSouth China Univ Technol, Sch Automat Sci & Engn, Guangzhou 510640, Guangdong, Peoples R China
Liu, Haiming
[1
]
Yuan, Peng
论文数: 0引用数: 0
h-index: 0
机构:
South China Univ Technol, Sch Automat Sci & Engn, Guangzhou 510640, Guangdong, Peoples R ChinaSouth China Univ Technol, Sch Automat Sci & Engn, Guangzhou 510640, Guangdong, Peoples R China
Yuan, Peng
[1
]
Luo, Jiaxiang
论文数: 0引用数: 0
h-index: 0
机构:
South China Univ Technol, Sch Automat Sci & Engn, Guangzhou 510640, Guangdong, Peoples R ChinaSouth China Univ Technol, Sch Automat Sci & Engn, Guangzhou 510640, Guangdong, Peoples R China
Luo, Jiaxiang
[1
]
Zhang, Mei
论文数: 0引用数: 0
h-index: 0
机构:
South China Univ Technol, Sch Automat Sci & Engn, Guangzhou 510640, Guangdong, Peoples R ChinaSouth China Univ Technol, Sch Automat Sci & Engn, Guangzhou 510640, Guangdong, Peoples R China
Zhang, Mei
[1
]
机构:
[1] South China Univ Technol, Sch Automat Sci & Engn, Guangzhou 510640, Guangdong, Peoples R China
来源:
PROCEEDINGS OF THE 36TH CHINESE CONTROL CONFERENCE (CCC 2017)
|
2017年
This paper studies the optimization problem of PCB assembly time for multi-head placement machine. Mathematical model is built and analyzed for the problem, which is of a combinatorial nature and computationally intractable. An optimization algorithm based on heuristic strategy and scatter search method is proposed to minimize the PCB assembly time. By relaxing the restrictions on the problem, the algorithm reduces the assembly time by minimizing cycles of pick-and-place, constructing the simultaneous pickups and optimizing sequence of pick-and-place of components. Numerical experiments were conducted to evaluate the proposed algorithm, along with a comparison with a heuristic algorithm (HA) under strong constraints proposed in existed literature. The results show that the proposed algorithm has better performance in optimization results and can shorten PCB assembly time of multi-head placement machine effectively.