Water-energy nexus under uncertainty: Development of a hierarchical decision-making model

被引:16
|
作者
Ma, Y. [1 ]
Li, Y. P. [1 ,2 ]
Huang, G. H. [1 ,2 ]
Liu, Y. R. [1 ]
机构
[1] Beijing Normal Univ, Sch Environm, Beijing 100875, Peoples R China
[2] Univ Regina, Inst Energy Environm & Sustainable Communities, Regina, SK S4S 0A2, Canada
关键词
Bi-level programming; Dual uncertainties; Stochastic analysis; Water-energy nexus; Water-resource allocation; RESOURCES MANAGEMENT; PROGRAMMING-MODEL; INTERVAL; OPTIMIZATION; ALLOCATION; OPTIMALITY; SYSTEMS;
D O I
10.1016/j.jhydrol.2020.125297
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In this study, an interval stochastic bi-level programming (ISBP) method is developed for planning the water-energy nexus (WEN) system. In ISBP, interval-parameter programming (IPP) and two-stage stochastic programming (TSP) are introduced into a bi-level programming (BP) framework. ISBP can tackle dual uncertainties expressed as probability distributions and interval values as well as balance the tradeoff between two-level decision makers. An ISBP-WEN model is then formulated for planning the WEN system of Jinan (the capital of Shandong province, China), in which the upper-level model aims to maximize system benefit and the lower-level model aims to minimize the electricity consumed for water allocation. Major findings are: (i) dual uncertainties can affect the city's water-allocation pattern and lead to different amounts of water shortage and electricity consumption; (ii) [25.5, 31.3]% of water-allocation target cannot be satisfied under the low water-flow level, implying that the city would face serious water shortage; (iii) compared with surface water and reclaimed water, groundwater is the scarcest source for the city and the proportion of groundwater deficit would be [41.2, 49.9]% under the low water-flow level; (iv) compared with the traditional single-level model, electricity consumption from ISBP-WEN would be reduced by [3.9, 5.1]%. These findings can help managers to identify the desired strategy between different stakeholders and provide numerical information for planning the WEN system under dual uncertainties.
引用
收藏
页数:12
相关论文
共 50 条
  • [1] Uncertainty-Informed Operation Coordination in a Water-Energy Nexus
    Alhazmi, Mohannad
    Dehghanian, Payman
    Nazemi, Mostafa
    Oikonomou, Konstantinos
    IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2023, 19 (05) : 6439 - 6449
  • [2] A Decision Tool for the Water-Energy Nexus in Jordan
    Danielson, Mats
    Ekenberg, Love
    Komendantova, Nadejda
    KNOWLEDGE INNOVATION THROUGH INTELLIGENT SOFTWARE METHODOLOGIES, TOOLS AND TECHNIQUES (SOMET_20), 2020, 327 : 294 - 302
  • [3] A novel two-stage fuzzy stochastic model for water supply management from a water-energy nexus perspective
    Ji, Ling
    Wu, Tianhao
    Xie, Yulei
    Huang, Guohe
    Sun, Lijian
    JOURNAL OF CLEANER PRODUCTION, 2020, 277 (277)
  • [4] Macroscopic-microscopic coupled water-energy nexus simulation and behavior optimization under uncertainty
    Zhang, Yang
    Zhen, Jiliang
    Lu, Wentao
    Liu, Chang
    Zhang, Jinbo
    Feng, Honglin
    Xie, Yulei
    Guo, Huaicheng
    ECOLOGICAL ENGINEERING, 2022, 179
  • [5] Water-energy nexus: The origin, development and prospect
    Ding, Tao
    Liang, Liang
    Zhou, Kaile
    Yang, Min
    Wei, Yuqi
    ECOLOGICAL MODELLING, 2020, 419 (419)
  • [6] A sustainable redesign model for the water/wastewater supply network: a water-energy nexus approach
    Gilani, Hani
    Shobeiry, Sahar
    Kami, Mohammad Biglari
    Sahebi, Hadi
    KYBERNETES, 2023, 52 (05) : 1842 - 1860
  • [7] Development of a Sequential Decision-Making Model for Controlling Multiple Air Pollutants Under Stochastic Uncertainty
    Lv, Ying
    Huang, Guohe
    Li, Yongping
    Yang, Zhifeng
    Sun, Wei
    WATER AIR AND SOIL POLLUTION, 2012, 223 (01) : 443 - 465
  • [8] Modeling the water-energy nexus in households
    Hadengue, Bruno
    Scheidegger, Andreas
    Morgenroth, Eberhard
    Larsen, Tove A.
    ENERGY AND BUILDINGS, 2020, 225
  • [9] A Cyber-Secured Operation for Water-Energy Nexus
    Zhao, Pengfei
    Gu, Chenghong
    Cao, Zhidong
    Xie, Da
    Teng, Fei
    Li, Jianwei
    Chen, Xinlei
    Wu, Chenye
    Yu, Dongmin
    Xu, Xu
    Li, Shuangqi
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2021, 36 (04) : 3105 - 3117
  • [10] Water-Energy Nexus in Typical Industrial Water Circuits
    Oliveira, Miguel C.
    Iten, Muriel
    Matos, Henrique A.
    Michels, Jochen
    WATER, 2019, 11 (04)