Multimode time-cost-robustness trade-off project scheduling problem under uncertainty

被引:6
作者
Li, Xue [1 ]
He, Zhengwen [1 ]
Wang, Nengmin [1 ]
Vanhoucke, Mario [2 ]
机构
[1] Xi An Jiao Tong Univ, Sch Management, Xian 710049, Peoples R China
[2] Univ Ghent, Fac Econ & Business Adm, B-9000 Ghent, Belgium
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
Project scheduling problem; Multiobjective optimization model; Trade-off; Epsilon-constraint method; Genetic algorithm; BI-OBJECTIVE MODEL; MULTIPLE MILESTONES; OPTIMIZATION; ALGORITHM; CONSTRAINTS;
D O I
10.1007/s10878-020-00636-7
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The time/cost trade-off problem is a well-known project scheduling problem that has been extensively studied. In recent years, many researchers have begun to focus on project scheduling problems under uncertainty to cope with uncertain factors, such as resource idleness, high inventory, and missing deadlines. To reduce the disturbance from uncertain factors, the aim of robust scheduling is to generate schedules with time buffers or resource buffers, which are capped by project makespan and project cost. This paper addresses a time-cost-robustness trade-off project scheduling problem with multiple activity execution modes under uncertainty. A multiobjective optimization model with three objectives (makespan minimization, cost minimization, and robustness maximization) is constructed and three propositions are proposed. An epsilon-constraint method-based genetic algorithm along with three improvement measures is designed to solve this NP-hard problem and to develop Pareto schedule sets, and a large-scale computational experiment on a randomly generated dataset is performed to validate the effectiveness of the proposed algorithm and the improvement measures. The final sensitivity analysis of three key parameters shows their distinctive influences on the three objectives, according to which several suggestions are given to project managers on the effective measures to improve the three objectives.
引用
收藏
页码:1173 / 1202
页数:30
相关论文
共 57 条
[51]   The discrete time/cost trade-off problem: extensions and heuristic procedures [J].
Vanhoucke, Mario ;
Debels, Dieter .
JOURNAL OF SCHEDULING, 2007, 10 (4-5) :311-326
[52]   Project scheduling with finite or infinite number of activity processing modes - A survey [J].
Weglarz, Jan ;
Jozefowska, Joanna ;
Mika, Marek ;
Waligora, Grzegorz .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 208 (03) :177-205
[53]   Metrics for quality assessment of a multiobjective design optimization solution set [J].
Wu, J ;
Azarm, S .
JOURNAL OF MECHANICAL DESIGN, 2001, 123 (01) :18-25
[54]   Best routes selection in multimodal networks using multi-objective genetic algorithm [J].
Xiong, Guiwu ;
Wang, Yong .
JOURNAL OF COMBINATORIAL OPTIMIZATION, 2014, 28 (03) :655-673
[55]   Ant colony optimization for multi-objective flow shop scheduling problem [J].
Yagmahan, Betul ;
Yenisey, Mehmet Mutlu .
COMPUTERS & INDUSTRIAL ENGINEERING, 2008, 54 (03) :411-420
[56]  
Zheng F, 2019, P INT C IND ENG SYST
[57]  
Zhu C, 2019, PROCEEDINGS OF THE ASME 14TH INTERNATIONAL MANUFACTURING SCIENCE AND ENGINEERING CONFERENCE, 2019, VOL 1