STRATEGIES FOR MINIMIZING INFORMATION ASYMMETRIES IN CONSTRUCTION PROJECTS: PROJECT MANAGERS' PERCEPTIONS

被引:20
作者
Ceric, Anita [1 ]
机构
[1] Univ Zagreb, Fac Civil Engn, Dept Construct Management & Econ, Zagreb 10000, Croatia
关键词
principal-agent theory; information asymmetries; risk-minimization strategies; project managers; trust; multi-attribute utility theory; DECISION-MAKING; SELECTION; SYSTEM;
D O I
10.3846/16111699.2012.720601
中图分类号
F [经济];
学科分类号
02 ;
摘要
Communication risk is of crucial importance in construction projects. The situation in which one of the project parties is better informed than another is known as information asymmetry. This problem is addressed by the principal-agent theory. According to this theory, information asymmetries cause three problems: adverse selection, moral hazard, and hold up. The focus here is on strategies for minimizing information asymmetries in the construction phase. A survey of project managers was conducted to establish an understanding of the relative importance of risk-minimization strategies established in the literature: bureaucratic control (contracts), information systems, incentives (bonuses), corporate culture, reputation, and trust. The multi-attribute utility theory was used to analyze the responses. According to the project managers who participated in the survey, trust is the most important strategy in the construction phase, followed by bureaucratic control (contracts) and information systems.
引用
收藏
页码:424 / 440
页数:17
相关论文
共 50 条
  • [31] Mitigation Measures for Information Asymmetry between Participants in Construction Projects: The Impact of Trust
    Ivic, Ivona
    Ceric, Anita
    SUSTAINABILITY, 2024, 16 (16)
  • [32] Prominent demotivational factors influencing the productivity of construction project managers in Qatar
    Jarkas, Abdulaziz M.
    Radosavljevic, Milan
    Liu Wuyi
    INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2014, 63 (08) : 1070 - 1090
  • [33] How personality traits influence management styles of construction project managers
    Ling, Florence Y. Y.
    Zhang, Zhe
    Wong, Wei Ting
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2020, 10 (03) : 453 - 468
  • [34] The role of project managers (PMs) in construction health and safety implementation in Ghana
    Agyekum, Kofi
    Ghansah, Frank Ato
    Tetteh, Portia Atswei
    Amudjie, Judith
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2021, 19 (01) : 245 - 262
  • [35] Cross-Cultural Understanding of Construction Project Managers' Conceptions of Their Work
    Chen, Ping
    Partington, David
    Qiang, Maoshan
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (06) : 477 - 487
  • [36] Measuring information flow in the detailed design of construction projects
    Tribelsky, Effi
    Sacks, Rafael
    RESEARCH IN ENGINEERING DESIGN, 2010, 21 (03) : 189 - 206
  • [37] Exploring Practitioners' Perceptions of Digital Delivery in Modular Integrated Construction Projects
    Wang, Shuo
    Lu, Yujie
    Lu, Jiahui
    Mao, Ye
    Wang, Na
    Guo, Zhenyu
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2025, 41 (02)
  • [38] Bidding Strategy to Support Decision-Making Based on Comprehensive Information in Construction Projects
    Liang, Ru
    Sheng, Zhaohan
    Xu, Feng
    Wu, Changzhi
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2016, 2016
  • [39] Exploring the linkages between project managers' mindset behaviour and project leadership style in the Ghanaian construction industry
    Owusu-Manu, De-Graft
    Debrah, Caleb
    Amissah, Lydia
    Edwards, David J.
    Chileshe, Nicholas
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (09) : 2690 - 2711
  • [40] The Effect of Project Names on Escalation of Commitment in Information Systems Projects
    Benschop, Nick
    Nuijten, Arno L. P.
    Keil, Mark
    Wilmink, Kristinka
    Commandeur, Harry R.
    PROJECT MANAGEMENT JOURNAL, 2023, 54 (04) : 349 - 365