SEM-PLS Analysis of Inhibiting Factors of Cost Performance for Large Construction Projects in Malaysia: Perspective of Clients and Consultants

被引:92
作者
Memon, Aftab Hameed [1 ]
Rahman, Ismail Abdul [1 ]
机构
[1] Univ Tun Hussein Onn Malaysia, Fac Civil & Environm Engn, Batu Pahat 86400, Johor, Malaysia
来源
SCIENTIFIC WORLD JOURNAL | 2014年
关键词
SQUARES; OVERRUN;
D O I
10.1155/2014/165158
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
This study uncovered inhibiting factors to cost performance in large construction projects of Malaysia. Questionnaire survey was conducted among clients and consultants involved in large construction projects. In the questionnaire, a total of 35 inhibiting factors grouped in 7 categories were presented to the respondents for rating significant level of each factor. A total of 300 questionnaire forms were distributed. Only 144 completed sets were received and analysed using advanced multivariate statistical software of Structural Equation Modelling (SmartPLS v2). The analysis involved three iteration processes where several of the factors were deleted in order to make the model acceptable. The result of the analysis found that R-2 value of the model is 0.422 which indicates that the developed model has a substantial impact on cost performance. Based on the final form of the model, contractor's site management category is the most prominent in exhibiting effect on cost performance of large construction projects. This finding is validated using advanced techniques of power analysis. This vigorous multivariate analysis has explicitly found the significant category which consists of several causative factors to poor cost performance in large construction projects. This will benefit all parties involved in construction projects for controlling cost overrun.
引用
收藏
页数:9
相关论文
共 40 条
  • [1] Using PLS-SEM technique to model construction organizations' willingness to participate in e-bidding
    Aibinu, Ajibade Ayodeji
    Al-Lawati, Ahmed Murtadha
    [J]. AUTOMATION IN CONSTRUCTION, 2010, 19 (06) : 714 - 724
  • [2] Akter S, 2011, AMCIS 2011 PROCEEDINGS
  • [3] Angelo W.J., 2002, Megaprojects need more study up front to avoid cost overruns
  • [4] Apolot R., 2008, P 2 INT C ADV ENG TE, P305
  • [5] Barclay D.C., 1995, Technology Studies: Special Issue on Research Methodology, V2, P285
  • [6] Byrne B, 2010, INTERNATIONAL HANDBOOK OF PSYCHOLOGY IN EDUCATION, P3
  • [7] Reasons for cost and schedule increase for engineering design projects
    Chang, AST
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2002, 18 (01) : 29 - 36
  • [8] Chin WW, 1998, QUANT METH SER, P295
  • [9] Cohen J., 2013, APPL MULTIPLE REGRES
  • [10] Cohen J., 1988, Statistical power analysis for the behavioral sciences, VSecond